Integrating flexible preventive maintenance activities into two-stage assembly flow shop scheduling with multiple assembly machines

被引:15
|
作者
Zhang, Zikai [1 ,2 ]
Tang, Qiuhua [1 ,2 ]
机构
[1] Wuhan Univ Sci & Technol, Key Lab Met Equipment & Control Technol, Minist Educ, Wuhan, Peoples R China
[2] Wuhan Univ Sci & Technol, Hubei Key Lab Mech Transmiss & Mfg Engn, Wuhan, Peoples R China
基金
中国国家自然科学基金;
关键词
Multiple assembly machines; Assembly flow shop; Preventive maintenance; Heuristics; Meta-heuristic; ITERATED GREEDY ALGORITHM; ARTIFICIAL BEE COLONY; SETUP TIMES; TARDINESS; MAKESPAN; MINIMIZATION; SYSTEM; COSTS;
D O I
10.1016/j.cie.2021.107493
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, preventive maintenance (PM) activities are incorporated into two-stage assembly flow shop scheduling where m1 dedicated machines in fabrication stage and m2 machines in assembly stage. Each machine is given a new feature maintenance level, whose initial value is determined based on the Weibull probability distribution. To ensure the machines' reliability and production continuity, we need to find a fit product sequence along with PM execution time points. Hence this paper tries to tackle this new integration problem by a mixed integer linear programming model, two heuristics MCMTPM and NEHPM, and a PM-based iterated greedy algorithm (IGPM). IGPM is embedded with a problem-specific solution evaluation and two types of local search methods. The final experimental results show that compared with the other 9 state-of-the-art methods, the proposed IGPM embedded with NEHPM and reference local search generates the best results in all benchmark instances.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] Integrating flexible preventive maintenance activities into two-stage assembly flow shop scheduling with multiple assembly machines
    Zhang, Zikai
    Tang, Qiuhua
    Computers and Industrial Engineering, 2021, 159
  • [2] Bi-objective optimization for integrating production and preventive maintenance scheduling in two-stage assembly flow shop problem
    Seidgar, Hany
    Zandieh, Mostafa
    Mahdavi, Iraj
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2016, 33 (06) : 404 - 425
  • [3] Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, constructive heuristics and meta-heuristics
    Zikai Zhang
    Qiuhua Tang
    Flexible Services and Manufacturing Journal, 2022, 34 : 156 - 203
  • [4] Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, constructive heuristics and meta-heuristics
    Zhang, Zikai
    Tang, Qiuhua
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2022, 34 (01) : 156 - 203
  • [5] A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines
    Koulamas, Christos
    Kyparisis, George J.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 182 (02) : 945 - 951
  • [6] Two-stage flow-shop scheduling problem with non-identical second stage assembly machines
    Navaei, J.
    Ghomi, S. M. T. Fatemi
    Jolai, F.
    Shiraqai, M. E.
    Hidaji, H.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 69 (9-12): : 2215 - 2226
  • [7] Two-stage flow-shop scheduling problem with non-identical second stage assembly machines
    J. Navaei
    S. M. T. Fatemi Ghomi
    F. Jolai
    M. E. Shiraqai
    H. Hidaji
    The International Journal of Advanced Manufacturing Technology, 2013, 69 : 2215 - 2226
  • [8] Simulated imperialist competitive algorithm in two-stage assembly flow shop with machine breakdowns and preventive maintenance
    Seidgar, Hany
    Zandieh, Mostafa
    Fazlollahtabar, Hamed
    Mahdavi, Iraj
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2016, 230 (05) : 934 - 953
  • [9] Two-stage assembly flow-shop scheduling problem with non-identical assembly machines considering setup times
    Mozdgir, A.
    Ghomi, S. M. T. Fatemi
    Jolai, F.
    Navaei, J.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (12) : 3625 - 3642
  • [10] On the two-stage assembly flow shop problem
    Hadda, Hatem
    Dridi, Najoua
    Hajri-Gabouj, Sonia
    TOP, 2024, 32 (02) : 224 - 244