Integrating flexible preventive maintenance activities into two-stage assembly flow shop scheduling with multiple assembly machines

被引:15
|
作者
Zhang, Zikai [1 ,2 ]
Tang, Qiuhua [1 ,2 ]
机构
[1] Wuhan Univ Sci & Technol, Key Lab Met Equipment & Control Technol, Minist Educ, Wuhan, Peoples R China
[2] Wuhan Univ Sci & Technol, Hubei Key Lab Mech Transmiss & Mfg Engn, Wuhan, Peoples R China
基金
中国国家自然科学基金;
关键词
Multiple assembly machines; Assembly flow shop; Preventive maintenance; Heuristics; Meta-heuristic; ITERATED GREEDY ALGORITHM; ARTIFICIAL BEE COLONY; SETUP TIMES; TARDINESS; MAKESPAN; MINIMIZATION; SYSTEM; COSTS;
D O I
10.1016/j.cie.2021.107493
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, preventive maintenance (PM) activities are incorporated into two-stage assembly flow shop scheduling where m1 dedicated machines in fabrication stage and m2 machines in assembly stage. Each machine is given a new feature maintenance level, whose initial value is determined based on the Weibull probability distribution. To ensure the machines' reliability and production continuity, we need to find a fit product sequence along with PM execution time points. Hence this paper tries to tackle this new integration problem by a mixed integer linear programming model, two heuristics MCMTPM and NEHPM, and a PM-based iterated greedy algorithm (IGPM). IGPM is embedded with a problem-specific solution evaluation and two types of local search methods. The final experimental results show that compared with the other 9 state-of-the-art methods, the proposed IGPM embedded with NEHPM and reference local search generates the best results in all benchmark instances.
引用
收藏
页数:15
相关论文
共 50 条
  • [31] A multi-level action coupling reinforcement learning approach for online two-stage flexible assembly flow shop scheduling
    Qiu, Junhao
    Liu, Jianjun
    Li, Zhantao
    Lai, Xinjun
    JOURNAL OF MANUFACTURING SYSTEMS, 2024, 76 : 370 - 370
  • [32] A multi-level action coupling reinforcement learning approach for online two-stage flexible assembly flow shop scheduling
    Qiu, Junhao
    Liu, Jianjun
    Li, Zhantao
    Lai, Xinjun
    JOURNAL OF MANUFACTURING SYSTEMS, 2024, 76 : 370 - 370
  • [33] A multi-level action coupling reinforcement learning approach for online two-stage flexible assembly flow shop scheduling
    Qiu, Junhao
    Liu, Jianjun
    Li, Zhantao
    Lai, Xinjun
    JOURNAL OF MANUFACTURING SYSTEMS, 2024, 76 : 370 - 370
  • [34] Improved approximation algorithms for two-stage flexible flow shop scheduling
    Anzhen Peng
    Longcheng Liu
    Weifeng Lin
    Journal of Combinatorial Optimization, 2021, 41 : 28 - 42
  • [35] Improved approximation algorithms for two-stage flexible flow shop scheduling
    Peng, Anzhen
    Liu, Longcheng
    Lin, Weifeng
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2021, 41 (01) : 28 - 42
  • [36] Maintenance costs and makespan minimization for assembly permutation flow shop scheduling by considering preventive and corrective maintenance
    Zhang, Zikai
    Tang, Qiuhua
    Chica, Manuel
    JOURNAL OF MANUFACTURING SYSTEMS, 2021, 59 : 549 - 564
  • [37] Multi objective two-stage assembly flow shop with release time
    Sheikh, Shaya
    Komaki, G. M.
    Kayvanfar, Vahid
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 124 : 276 - 292
  • [38] Mathematical models for multi-stage hybrid assembly flow-shop scheduling with preventive maintenance and release times
    Alexander, David Anunay
    Pandey, Avishek
    Kumar, Sri Krishna
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 186
  • [39] Lot streaming in a two-stage assembly hybrid flow shop scheduling problem with a work shift constraint
    Nejati, Mohsen
    Mahdavi, Iraj
    Hassanzadeh, Reza
    Mahdavi-Amiri, Nezam
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2016, 33 (07) : 459 - 471
  • [40] Grey Wolf Optimizer algorithm for the two-stage assembly flow shop scheduling problem with release time
    Komaki, G. M.
    Kayvanfar, Vahid
    JOURNAL OF COMPUTATIONAL SCIENCE, 2015, 8 : 109 - 120