Integrating flexible preventive maintenance activities into two-stage assembly flow shop scheduling with multiple assembly machines

被引:15
|
作者
Zhang, Zikai [1 ,2 ]
Tang, Qiuhua [1 ,2 ]
机构
[1] Wuhan Univ Sci & Technol, Key Lab Met Equipment & Control Technol, Minist Educ, Wuhan, Peoples R China
[2] Wuhan Univ Sci & Technol, Hubei Key Lab Mech Transmiss & Mfg Engn, Wuhan, Peoples R China
基金
中国国家自然科学基金;
关键词
Multiple assembly machines; Assembly flow shop; Preventive maintenance; Heuristics; Meta-heuristic; ITERATED GREEDY ALGORITHM; ARTIFICIAL BEE COLONY; SETUP TIMES; TARDINESS; MAKESPAN; MINIMIZATION; SYSTEM; COSTS;
D O I
10.1016/j.cie.2021.107493
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, preventive maintenance (PM) activities are incorporated into two-stage assembly flow shop scheduling where m1 dedicated machines in fabrication stage and m2 machines in assembly stage. Each machine is given a new feature maintenance level, whose initial value is determined based on the Weibull probability distribution. To ensure the machines' reliability and production continuity, we need to find a fit product sequence along with PM execution time points. Hence this paper tries to tackle this new integration problem by a mixed integer linear programming model, two heuristics MCMTPM and NEHPM, and a PM-based iterated greedy algorithm (IGPM). IGPM is embedded with a problem-specific solution evaluation and two types of local search methods. The final experimental results show that compared with the other 9 state-of-the-art methods, the proposed IGPM embedded with NEHPM and reference local search generates the best results in all benchmark instances.
引用
收藏
页数:15
相关论文
共 50 条
  • [41] Cooperated teaching-learning-based optimisation for distributed two-stage assembly flow shop scheduling
    Lei, Deming
    Su, Bin
    Li, Ming
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (23) : 7232 - 7245
  • [42] Scheduling a Two Stage Proportionate Flexible Flow Shop with Dedicated Machines and No Buffers
    Ackermann, Heiner
    Schwehm, Lena
    Weiss, Christian
    OPERATIONS RESEARCH PROCEEDINGS 2021, 2022, : 353 - 358
  • [43] Three-Stage Assembly Flow Shop Scheduling Problem with a Fixed Maintenance Period
    Yuan, Yuan
    Han, Xin
    Zhou, Yong
    Liu, Xingwu
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2023, 40 (05)
  • [44] Two-stage multiprocessor flow shop scheduling with deteriorating maintenance in cleaner production
    Huang, Rong-Hwa
    Yu, Shun-Chi
    JOURNAL OF CLEANER PRODUCTION, 2016, 135 : 276 - 283
  • [45] Scheduling two-stage assembly flow shop with random machines breakdowns: integrated new self-adapted differential evolutionary and simulation approach
    Hany Seidgar
    Hamed Fazlollahtabar
    Mostafa Zandieh
    Soft Computing, 2020, 24 : 8377 - 8401
  • [46] The two stage assembly flow-shop scheduling problem with batching and delivery
    Kazemi, Hamed
    Mazdeh, Mohammad Mahdavi
    Rostami, Mohammad
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2017, 63 : 98 - 107
  • [47] Scheduling two-stage assembly flow shop with random machines breakdowns: integrated new self-adapted differential evolutionary and simulation approach
    Seidgar, Hany
    Fazlollahtabar, Hamed
    Zandieh, Mostafa
    SOFT COMPUTING, 2020, 24 (11) : 8377 - 8401
  • [48] Two hybrid flow shop scheduling lines with assembly stage and compatibility constraints
    Munoz-Sanchez, Rafael
    Martinez-Salazar, Iris
    Luis Gonzalez-Velarde, Jose
    Rios Solis, Yasmin A.
    PLOS ONE, 2024, 19 (06):
  • [49] Two-stage flexible flow shop scheduling subject to fixed job sequences
    Hwang, F. J.
    Lin, Bertrand M. T.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2016, 67 (03) : 506 - 515
  • [50] Scheduling of multi-component products in a two-stage flexible flow shop
    Nikzad, Fatemeh
    Rezaeian, Javad
    Mandavi, Iraj
    Rastgar, Iman
    APPLIED SOFT COMPUTING, 2015, 32 : 132 - 143