Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, constructive heuristics and meta-heuristics

被引:14
|
作者
Zhang, Zikai [1 ,2 ]
Tang, Qiuhua [1 ,2 ]
机构
[1] Wuhan Univ Sci & Technol, Key Lab Met Equipment & Control Technol, Minist Educ, Wuhan, Peoples R China
[2] Wuhan Univ Sci & Technol, Hubei Key Lab Mech Transmiss & Mfg Engn, Wuhan, Peoples R China
基金
中国国家自然科学基金;
关键词
Assembly flow shop; Preventive maintenance; Constructive heuristic; Meta-heuristic; Q-learning;
D O I
10.1007/s10696-021-09403-0
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, flexible preventive maintenance (PM) activities are incorporated into two-stage assembly flow shop scheduling where m dedicated machines in the fabrication stage and one machine in the assembly stage. The operational status of each machine is described by a continuous variable, maintenance level. The maintenance level value is inversely proportional to the processing time. Once a PM activity is performed, this value will return to the initial value. Different from the PM at fixed predefined time intervals, flexible PM can be carried out at any time point, but the maintenance levels are not less than 0. Hence, a MILP model with maintenance level constraints is formulated to minimize the total completion time and maintenance time. Regarding the methods, a latest PM decision strategy is proposed to determine the execution time of PM activities. This new strategy is embedded into 15 constructive heuristics and 7 meta-heuristics (three variants of iterated local search, three variants of Q-learning-based ant colony system with local search and a Q-learning-based hyper-heuristics) to address this new problem. The final experimental analysis demonstrates the significance of the integrated model and the effectiveness of the proposed constructive heuristics and meta-heuristics.
引用
收藏
页码:156 / 203
页数:48
相关论文
共 50 条
  • [1] Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, constructive heuristics and meta-heuristics
    Zikai Zhang
    Qiuhua Tang
    Flexible Services and Manufacturing Journal, 2022, 34 : 156 - 203
  • [2] Three meta-heuristics to solve the no-wait two-stage assembly flow-shop scheduling problem
    Mozdgir, A.
    Ghomi, S. M. T. Fatemi
    Jolai, F.
    Navaei, J.
    SCIENTIA IRANICA, 2013, 20 (06) : 2275 - 2283
  • [3] Effective constructive heuristics and meta-heuristics for the distributed assembly permutation flowshop scheduling problem
    Pan, Quan-Ke
    Gao, Liang
    Li Xin-Yu
    Jose, Framinan M.
    APPLIED SOFT COMPUTING, 2019, 81
  • [4] Analysis of a Heuristics for Scheduling Two-Stage Hybrid Flow Shop
    Xie, Xie
    Tang, Lixin
    INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION, VOL 2, PROCEEDINGS, 2009, : 879 - 882
  • [5] Integrating flexible preventive maintenance activities into two-stage assembly flow shop scheduling with multiple assembly machines
    Zhang, Zikai
    Tang, Qiuhua
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 159
  • [6] Integrating flexible preventive maintenance activities into two-stage assembly flow shop scheduling with multiple assembly machines
    Zhang, Zikai
    Tang, Qiuhua
    Computers and Industrial Engineering, 2021, 159
  • [7] Automatic Design of Efficient Heuristics for Two-Stage Hybrid Flow Shop Scheduling
    Liu, Lingxuan
    Shi, Leyuan
    SYMMETRY-BASEL, 2022, 14 (04):
  • [8] Bi-objective optimization for integrating production and preventive maintenance scheduling in two-stage assembly flow shop problem
    Seidgar, Hany
    Zandieh, Mostafa
    Mahdavi, Iraj
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2016, 33 (06) : 404 - 425
  • [9] Meta-heuristics for the distributed two-stage assembly scheduling problem with bi-criteria of makespan and mean completion time
    Xiong, Fuli
    Xing, Keyi
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (09) : 2743 - 2766
  • [10] New efficient constructive heuristics for the two-stage multi-machine assembly scheduling problem
    Talens, Carla
    Fernandez-Viagas, Victor
    Perez-Gonzalez, Paz
    Framinan, Jose M.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 140