Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, constructive heuristics and meta-heuristics

被引:14
|
作者
Zhang, Zikai [1 ,2 ]
Tang, Qiuhua [1 ,2 ]
机构
[1] Wuhan Univ Sci & Technol, Key Lab Met Equipment & Control Technol, Minist Educ, Wuhan, Peoples R China
[2] Wuhan Univ Sci & Technol, Hubei Key Lab Mech Transmiss & Mfg Engn, Wuhan, Peoples R China
基金
中国国家自然科学基金;
关键词
Assembly flow shop; Preventive maintenance; Constructive heuristic; Meta-heuristic; Q-learning;
D O I
10.1007/s10696-021-09403-0
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, flexible preventive maintenance (PM) activities are incorporated into two-stage assembly flow shop scheduling where m dedicated machines in the fabrication stage and one machine in the assembly stage. The operational status of each machine is described by a continuous variable, maintenance level. The maintenance level value is inversely proportional to the processing time. Once a PM activity is performed, this value will return to the initial value. Different from the PM at fixed predefined time intervals, flexible PM can be carried out at any time point, but the maintenance levels are not less than 0. Hence, a MILP model with maintenance level constraints is formulated to minimize the total completion time and maintenance time. Regarding the methods, a latest PM decision strategy is proposed to determine the execution time of PM activities. This new strategy is embedded into 15 constructive heuristics and 7 meta-heuristics (three variants of iterated local search, three variants of Q-learning-based ant colony system with local search and a Q-learning-based hyper-heuristics) to address this new problem. The final experimental analysis demonstrates the significance of the integrated model and the effectiveness of the proposed constructive heuristics and meta-heuristics.
引用
收藏
页码:156 / 203
页数:48
相关论文
共 50 条
  • [21] Two meta-heuristics for three-stage assembly flowshop scheduling with sequence-dependent setup times
    Sara Hatami
    Sadalah Ebrahimnejad
    Reza Tavakkoli-Moghaddam
    Yasaman Maboudian
    The International Journal of Advanced Manufacturing Technology, 2010, 50 : 1153 - 1164
  • [22] Two new meta-heuristics for a bi-objective supply chain scheduling problem in flow-shop environment
    Hassanzadeh, Alborz
    Rasti-Barzoki, Morteza
    Khosroshahi, Hossein
    APPLIED SOFT COMPUTING, 2016, 49 : 335 - 351
  • [23] Local search heuristics for two-stage flow shop problems with secondary criterion
    Gupta, JND
    Hennig, K
    Werner, F
    COMPUTERS & OPERATIONS RESEARCH, 2002, 29 (02) : 123 - 149
  • [24] Improved Meta-Heuristics for Solving Distributed Lot-Streaming Permutation Flow Shop Scheduling Problems
    Pan, Yuxia
    Gao, Kaizhou
    Li, Zhiwu
    Wu, Naiqi
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2023, 20 (01) : 361 - 371
  • [25] Heuristics for scheduling a two-stage hybrid flow shop with parallel batching machines: application at a hospital sterilisation plant
    Rossi, Andrea
    Puppato, Alessio
    Lanzetta, Michele
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (08) : 2363 - 2376
  • [26] Constructive Heuristics Comparison in Hybrid Flow Shop Scheduling Environments with Missing Operations
    Dios, Manuel
    Manuel Framinan, Jose
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 858 - 868
  • [27] Constructive and composite heuristics for the 2-stage assembly scheduling problem with periodic maintenance and makespan objective
    Talens, Carla
    Fernandez-Viagas, Victor
    Perez-Gonzalez, Paz
    Costa, Antonio
    EXPERT SYSTEMS WITH APPLICATIONS, 2022, 206
  • [28] Comprehensive review and evaluation of heuristics and meta-heuristics for two-sided assembly line balancing problem
    Li, Zixiang
    Kucukkoc, Ibrahim
    Nilakantan, J. Mukund
    COMPUTERS & OPERATIONS RESEARCH, 2017, 84 : 146 - 161
  • [29] Efficient Lagrangian heuristics for the two-stage flow shop with job dependent buffer requirements
    Gu, Hanyu
    Kononov, Alexander
    Memar, Julia
    Zinder, Yakov
    JOURNAL OF DISCRETE ALGORITHMS, 2018, 52-53 : 143 - 155
  • [30] Efficient Lagrangian Heuristics for the Two-Stage Flow Shop with Job Dependent Buffer Requirements
    Gu, Hanyu
    Memar, Julia
    Zinder, Yakov
    COMBINATORIAL ALGORITHMS, IWOCA 2017, 2018, 10765 : 312 - 324