共 50 条
- [1] Two-stage flow-shop scheduling problem with non-identical second stage assembly machines [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 69 (9-12): : 2215 - 2226
- [2] Two-stage flow-shop scheduling problem with non-identical second stage assembly machines [J]. The International Journal of Advanced Manufacturing Technology, 2013, 69 : 2215 - 2226
- [5] THE TWO-STAGE ASSEMBLY FLOWSHOP SCHEDULING PROBLEM WITH SETUP TIMES [J]. PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 2029 - 2035