共 50 条
- [1] Two-stage flow-shop scheduling problem with non-identical second stage assembly machines INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 69 (9-12): : 2215 - 2226
- [3] Two-stage flexible flow-shop scheduling problem with m identical parallel machines on one stage and a batch processor on the other stage J. Harbin Inst. Technol., 2008, 5 (674-678):
- [5] A Two-Stage Ant Colony Algorithm for Job Shop Scheduling with Non-Identical Parallel Machines INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND INDUSTRIAL AUTOMATION (ICITIA 2015), 2015, : 490 - 502