摘要
A scheduling model for a production system including machining, setup and assembly operations is considered. Production of a number of single-item products is ordered. Each product is made by assembling a set of several different parts. First, the parts are manufactured in a flow-shop consisting of multiple machines. Then, they are assembled into products on a single assembly stage. Setup operation and setup time are needed when a machine starts processing the parts or it changes items. The operations are partitioned into several blocks. Each block consists of the machining operations, the setup operations.. and the assembly operation(s) for one or several products. The parts of the same item in a block are processed successively. The objective function is the mean completion time for all products. We consider a problem to partition the operations into blocks and sequence the parts in each block so as to minimize the objective function. Solution procedures using pseudo-dynamic programming and a branch-and-bound method are proposed. Computational experiments are carried out to evaluate the performance of the solution procedures. It has been found that a good near-optimal schedule is obtained efficiently by the proposed solution procedures. (C) 2006 Elsevier B.V. All rights reserved.
引用
收藏
页码:1184 / 1195
页数:12
相关论文
共 50 条
  • [1] Hybrid flow-shop scheduling with assembly operations
    Yokoyama, M
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 73 (02) : 103 - 116
  • [2] FLOW-SHOP SCHEDULING WITH MULTIPLE OPERATIONS AND TIME LAGS
    RIEZEBOS, J
    GAALMAN, GJC
    GUPTA, JND
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 1995, 6 (02) : 105 - 115
  • [3] HEURISTICS IN FLOW-SHOP SCHEDULING WITH SEQUENCE DEPENDENT SETUP TIMES
    SIMONS, JV
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1992, 20 (02): : 215 - 225
  • [4] A flow-shop problem formulation of biomass handling operations scheduling
    Bochtis, D. D.
    Dogoulis, P.
    Busato, P.
    Sorensen, C. G.
    Berruto, R.
    Gemtos, T.
    [J]. COMPUTERS AND ELECTRONICS IN AGRICULTURE, 2013, 91 : 49 - 56
  • [5] A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations
    Fattahi, Parviz
    Hosseini, Seyed Mohammad Hassan
    Jolai, Fariborz
    Tavakkoli-Moghaddam, Reza
    [J]. APPLIED MATHEMATICAL MODELLING, 2014, 38 (01) : 119 - 134
  • [6] HYBRID GENETIC ALGORITHM FOR ASSEMBLY FLOW-SHOP SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP AND TRANSPORTATION TIMES
    Dalfard, Vahid Majazi
    Ardakani, Allahyar
    Banihashemi, Tak Nazalsadat
    [J]. TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2011, 18 (04): : 497 - 504
  • [7] Two-stage assembly flow-shop scheduling problem with non-identical assembly machines considering setup times
    Mozdgir, A.
    Ghomi, S. M. T. Fatemi
    Jolai, F.
    Navaei, J.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (12) : 3625 - 3642
  • [8] Cyclic flow-shop scheduling with no-wait constraints and missing operations
    Smutnicki, Czeslaw
    Pempera, Jaroslaw
    Bocewicz, Grzegorz
    Banaszak, Zbigniew
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 302 (01) : 39 - 49
  • [9] The two stage assembly flow-shop scheduling problem with batching and delivery
    Kazemi, Hamed
    Mazdeh, Mohammad Mahdavi
    Rostami, Mohammad
    [J]. ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2017, 63 : 98 - 107
  • [10] Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times
    Yokoyama, M
    Santos, DL
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 161 (03) : 754 - 770