HEURISTICS IN FLOW-SHOP SCHEDULING WITH SEQUENCE DEPENDENT SETUP TIMES

被引:31
|
作者
SIMONS, JV
机构
[1] Air Force Institute of Technology, Wright-Patterson Air Force Base, OH
来源
关键词
FLOW SHOP; SCHEDULING; HEURISTICS;
D O I
10.1016/0305-0483(92)90075-I
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper addresses the scheduling of jobs with sequence dependent setup times in a deterministic, static flowshop scenario. Four heuristics are described and compared with three benchmarks which represent generally practiced approaches to scheduling in this environment. Performance results are presented for a series of test problems taken from and comparable to those described in previous research. The results indicate that while sophistication does not necessarily lead to performance improvements, two of the proposed heuristics produce substantially better results than the other methods tested and merit consideration for implementation in practice.
引用
收藏
页码:215 / 225
页数:11
相关论文
共 50 条
  • [1] Heuristics for the Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup times
    Yong, Liao
    Zhantao, Li
    Xiang, Li
    Chenfeng, Peng
    [J]. Mathematical Problems in Engineering, 2022, 2022
  • [2] Heuristics for the Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup times
    Yong, Liao
    Zhantao, Li
    Xiang, Li
    Chenfeng, Peng
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [3] Development and analysis of robust neighbourhood search for flow-shop scheduling problems with sequence dependent setup times
    Jayakumar, V
    Vanchipura, Rajesh
    [J]. EMERGING TRENDS IN ENGINEERING, SCIENCE AND TECHNOLOGY FOR SOCIETY, ENERGY AND ENVIRONMENT, 2018, : 329 - 334
  • [4] Flow shop batching and scheduling with sequence-dependent setup times
    Shen, Liji
    Gupta, Jatinder N. D.
    Buscher, Udo
    [J]. JOURNAL OF SCHEDULING, 2014, 17 (04) : 353 - 370
  • [5] Flow shop batching and scheduling with sequence-dependent setup times
    Liji Shen
    Jatinder N. D. Gupta
    Udo Buscher
    [J]. Journal of Scheduling, 2014, 17 : 353 - 370
  • [6] HYBRID GENETIC ALGORITHM FOR ASSEMBLY FLOW-SHOP SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP AND TRANSPORTATION TIMES
    Dalfard, Vahid Majazi
    Ardakani, Allahyar
    Banihashemi, Tak Nazalsadat
    [J]. TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2011, 18 (04): : 497 - 504
  • [7] Hybrid Estimation of Distribution Algorithm for Blocking Flow-Shop Scheduling Problem with Sequence-Dependent Setup Times
    Zhang, Zi-Qi
    Qian, Bin
    Liu, Bo
    Hu, Rong
    Zhang, Chang-Sheng
    [J]. INTELLIGENT COMPUTING THEORIES AND APPLICATION, PT I, 2018, 10954 : 628 - 637
  • [8] Two-stage no-wait hybrid flow-shop scheduling with sequence-dependent setup times
    Wang, Shijin
    Wang, Xiaodong
    Yu, Li
    [J]. INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE-OPERATIONS & LOGISTICS, 2020, 7 (03) : 291 - 307
  • [9] Heuristics for permutation flow shop scheduling with batch setup times
    Sotskov, YN
    Tautenhahn, T
    Werner, F
    [J]. OR SPEKTRUM, 1996, 18 (02) : 67 - 80
  • [10] A note on heuristics of flow-shop scheduling
    Lai, TC
    [J]. OPERATIONS RESEARCH, 1996, 44 (04) : 648 - 652