On the two-stage assembly flow shop problem

被引:0
|
作者
Hadda, Hatem [1 ]
Dridi, Najoua [1 ]
Hajri-Gabouj, Sonia [2 ]
机构
[1] Univ Tunis El Manar, Ecole Natl Ingenieurs Tunis, BP 37 Le Belvedere, Tunis 1002, Tunisia
[2] Ctr Urbain Nord, INSAT, LISI, BP N676, Tunis 1080, Tunisia
关键词
Assembly flow shop; Branch and bound; Heuristic; Dominance rule; Lower bound; SCHEDULING PROBLEM; HEURISTICS; 3-MACHINE; ALGORITHM; MAKESPAN; MACHINE; SETUP;
D O I
10.1007/s11750-024-00664-0
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Numerous operational constraints within both industry and service sectors mandate the concurrent scheduling of tasks. This need is particularly evident in the assembly of products within manufacturing processes. This paper concentrates on minimizing makespan in the two-stage assembly flow shop problem. Our contributions include the introduction of novel dominance rules, a proposal for a heuristic method, and the development of a branch and bound algorithm. Additionally, we conduct an empirical analysis of makespan distribution for small-size instances. Through extensive experimentation, our study demonstrates the efficiency of the introduced dominance rules and the strong performance of the developed branch and bound algorithm.
引用
下载
收藏
页码:224 / 244
页数:21
相关论文
共 50 条
  • [1] An efficient imperialist competitive algorithm for scheduling in the two-stage assembly flow shop problem
    Seidgar, Hany
    Kiani, Morteza
    Abedi, Mehdi
    Fazlollahtabar, Hamed
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (04) : 1240 - 1256
  • [2] A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines
    Koulamas, Christos
    Kyparisis, George J.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 182 (02) : 945 - 951
  • [3] Metaheuristics for two-stage flow-shop assembly problem with a truncation learning function
    Wu, Chin-Chia
    Zhang, Xingong
    Azzouz, Ameni
    Shen, Wei-Lun
    Cheng, Shuenn-Ren
    Hsu, Peng-Hsiang
    Lin, Win-Chin
    ENGINEERING OPTIMIZATION, 2021, 53 (05) : 843 - 866
  • [4] A competitive memetic algorithm for the distributed two-stage assembly flow-shop scheduling problem
    Deng, Jin
    Wang, Ling
    Wang, Sheng-yao
    Zheng, Xiao-long
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (12) : 3561 - 3577
  • [5] A hybrid electromagnetism-like algorithm for two-stage assembly flow shop scheduling problem
    Yan, Hong-Sen
    Wan, Xiao-Qin
    Xiong, Fu-Li
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (19) : 5626 - 5639
  • [6] A two-stage flow shop scheduling problem with transportation considerations
    Chikhi, Nacira
    Abbas, Moncef
    Benmansour, Rachid
    Bekrar, Abdelghani
    Hanafi, Said
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2015, 13 (04): : 381 - 402
  • [7] A two-stage flow shop scheduling problem with transportation considerations
    Nacira Chikhi
    Moncef Abbas
    Rachid Benmansour
    Abdelghani Bekrar
    Saïd Hanafi
    4OR, 2015, 13 : 381 - 402
  • [8] BATCH SCHEDULING IN A TWO-STAGE FLEXIBLE FLOW SHOP PROBLEM
    Gerstl, Enrique
    Mosheiov, Gur
    Sarig, Assaf
    FOUNDATIONS OF COMPUTING AND DECISION SCIENCES, 2014, 39 (01) : 3 - 16
  • [9] Two-stage flow-shop scheduling problem with non-identical second stage assembly machines
    Navaei, J.
    Ghomi, S. M. T. Fatemi
    Jolai, F.
    Shiraqai, M. E.
    Hidaji, H.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 69 (9-12): : 2215 - 2226
  • [10] Two-stage flow-shop scheduling problem with non-identical second stage assembly machines
    J. Navaei
    S. M. T. Fatemi Ghomi
    F. Jolai
    M. E. Shiraqai
    H. Hidaji
    The International Journal of Advanced Manufacturing Technology, 2013, 69 : 2215 - 2226