Study on trade-off of time-cost-quality in construction project based on BIM

被引:0
|
作者
Xu Yongge [1 ]
Wei Ya [1 ]
机构
[1] Xian Univ Arch & Tech, Xian 710055, Peoples R China
关键词
Building information modeling; Construction project; Time-cost-quality trade-off optimization; Genetic algorithm;
D O I
暂无
中图分类号
C [社会科学总论];
学科分类号
03 ; 0303 ;
摘要
With the development of BIM technology, BIM provides a new direction for the project management of three objectives. Based on the current situation of the project time cost-optimized mass balance studies, pointing out the implementation mechanism of achieving the trade-off of time-cost-quality in construction project based on BIM mainly oriented components of the BIM model based; the use of Structured Query Language query statistics data information needs combined bill of quantities calculation method for the specification, preliminary engineering scale generation; establishment of Project relations system model. In the process duration is subject, for the construction of uncertainty factors such as interest rates and prices, through the establishment of quality, cost and schedule function, the establishment of quality balanced schedule cost optimization model, using genetic algorithm model of the optimal solution are obtained. With BIM case finally proves the rationality of the model and the effectiveness of the proposed genetic.
引用
收藏
页码:864 / 870
页数:7
相关论文
共 50 条
  • [1] Genetic Algorithms for Construction Time-Cost-Quality Trade-Off: A Road Project Case Study
    Sorrentino, Mariarosa
    [J]. IN BO-RICERCHE E PROGETTI PER IL TERRITORIO LA CITTA E L ARCHITETTURA, 2013, 4 (02): : 163 - 176
  • [2] Time-cost-quality trade-off analysis for highway construction
    El-Rayes, K
    Kandil, A
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (04) : 477 - 486
  • [3] Time-cost-quality trade-off analysis for planning construction projects
    Wang, Tianqi
    Abdallah, Moatassem
    Clevenger, Caroline
    Monghasemi, Shahryar
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (01) : 82 - 100
  • [4] CONSTRUCTION MATERIALS-BASED METHODOLOGY FOR TIME-COST-QUALITY TRADE-OFF PROBLEMS
    Kazaz, Aynur
    Ulubeyli, Serdar
    Bayram, E. R.
    Acikara, Turgut
    [J]. 5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 35 - 41
  • [5] A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction
    Fu, Fang
    Zhang, Tao
    [J]. PLOS ONE, 2016, 11 (12):
  • [6] Optimization of environmental impacts of construction projects: a time-cost-quality trade-off approach
    Banihashemi, S. A.
    Khalilzadeh, Mohammad
    Shahraki, A.
    Malkhalifeh, M. Rostami
    Ahmadizadeh, S. S. R.
    [J]. INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2021, 18 (03) : 631 - 646
  • [7] A fuzzy clustering-based genetic algorithm approach for time-cost-quality trade-off problems: A case study of highway construction project
    Mungle, Santosh
    Benyoucef, Lyes
    Son, Young-Jun
    Tiwari, M. K.
    [J]. ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2013, 26 (08) : 1953 - 1966
  • [8] Project Time-Cost-Quality Trade-off Problem: A Novel Approach Based on Fuzzy Decision Making
    Keshavarz, Esmaeil
    Shoul, Abbas
    [J]. INTERNATIONAL JOURNAL OF UNCERTAINTY FUZZINESS AND KNOWLEDGE-BASED SYSTEMS, 2020, 28 (04) : 545 - 567
  • [9] Multi-Objective Optimization of Construction Project Time-Cost-Quality Trade-off Using Differential Evolution Algorithm
    Narayanan, A. Sathya
    Suribabu, C. R.
    [J]. JORDAN JOURNAL OF CIVIL ENGINEERING, 2014, 8 (04) : 375 - 392
  • [10] Presenting a goal programming model in the time-cost-quality trade-off
    Hamta, Nima
    Ehsanifar, Mohammad
    Sarikhani, Javad
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (01) : 1 - 11