Study on trade-off of time-cost-quality in construction project based on BIM

被引:0
|
作者
Xu Yongge [1 ]
Wei Ya [1 ]
机构
[1] Xian Univ Arch & Tech, Xian 710055, Peoples R China
关键词
Building information modeling; Construction project; Time-cost-quality trade-off optimization; Genetic algorithm;
D O I
暂无
中图分类号
C [社会科学总论];
学科分类号
03 ; 0303 ;
摘要
With the development of BIM technology, BIM provides a new direction for the project management of three objectives. Based on the current situation of the project time cost-optimized mass balance studies, pointing out the implementation mechanism of achieving the trade-off of time-cost-quality in construction project based on BIM mainly oriented components of the BIM model based; the use of Structured Query Language query statistics data information needs combined bill of quantities calculation method for the specification, preliminary engineering scale generation; establishment of Project relations system model. In the process duration is subject, for the construction of uncertainty factors such as interest rates and prices, through the establishment of quality, cost and schedule function, the establishment of quality balanced schedule cost optimization model, using genetic algorithm model of the optimal solution are obtained. With BIM case finally proves the rationality of the model and the effectiveness of the proposed genetic.
引用
收藏
页码:864 / 870
页数:7
相关论文
共 50 条
  • [41] Application of Time-Cost-Quality Tradeoff Optimization Model Based on Improved PSO Algorithm to Construction Project
    Yang, Qin
    [J]. 2009 ASIA-PACIFIC CONFERENCE ON INFORMATION PROCESSING (APCIP 2009), VOL 2, PROCEEDINGS, 2009, : 298 - 301
  • [42] Project time–cost trade-off scheduling: a hybrid optimization approach
    Hadi Mokhtari
    Abdollah Aghaie
    Javad Rahimi
    Ashkan Mozdgir
    [J]. The International Journal of Advanced Manufacturing Technology, 2010, 50 : 811 - 822
  • [43] Time-Cost-Quality Trade-off Model for Optimal Pile Type Selection Using Discrete Particle Swarm Optimization Algorithm
    Lateef, Hanaa H.
    Burhan, Abbas M.
    [J]. CIVIL ENGINEERING JOURNAL-TEHRAN, 2019, 5 (11): : 2461 - 2471
  • [44] THE TIME-COST TRADE-OFF ANALYSIS IN CONSTRUCTION PROJECT USING COMPUTER SIMULATION AND INTERACTIVE PROCEDURE
    Blaszczyk, Tomasz
    Nowak, Maciej
    [J]. TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2009, 15 (04) : 523 - 539
  • [45] An overview of the time-cost trade-off problems of project planning
    Csordas, Helga
    [J]. CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 323 - 326
  • [46] Ti time-cost-quality tradeoff optimization in construction project based on modified ant colony algorithm
    Huang, Yuan-Sheng
    Deng, Jia-Jia
    Zang, Yun-Yun
    [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2008, : 1031 - 1035
  • [47] Factors affecting time and cost trade-off in multiple construction projects
    Hasan, Musaab Falih
    Mohammed, Sawsan Rasheed
    [J]. ARCHIVES OF CIVIL ENGINEERING, 2022, 68 (02) : 549 - 561
  • [48] A TRADE-OFF BETWEEN TIME AND COST IN SCHEDULING REPETITIVE CONSTRUCTION PROJECTS
    Zhang, Lihui
    Zou, Xin
    Qi, Jianxun
    [J]. JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2015, 11 (04) : 1423 - 1434
  • [49] The dialectical relationship of time-cost-quality in whole life cycle construction project management
    Li, W
    Cai, SQ
    [J]. PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, 2004, : 267 - 270
  • [50] A new interval-valued fuzzy multi-objective approach for project time-cost-quality trade-off problem with activity crashing and overlapping under uncertainty
    Mahdavi-Roshan, Pouyan
    Mousavi, Seyed Meysam
    [J]. KYBERNETES, 2023, 52 (10) : 4731 - 4759