THE TIME-COST TRADE-OFF ANALYSIS IN CONSTRUCTION PROJECT USING COMPUTER SIMULATION AND INTERACTIVE PROCEDURE

被引:20
|
作者
Blaszczyk, Tomasz [1 ]
Nowak, Maciej [1 ]
机构
[1] Karol Adamiecki Univ Econ, Dept Operat Res, PL-40287 Katowice, Poland
关键词
project planning; multi-criteria decision aiding; time-cost trade-off; interactive approach; simulation; STOCHASTIC-DOMINANCE; ALGORITHM; NETWORKS; MODELS;
D O I
10.3846/1392-8619.2009.15.523-539
中图分类号
F [经济];
学科分类号
02 ;
摘要
Several criteria must be considered while preparing the schedule of a construction project. The completion time and project cost are analyzed in most cases. Additionally, the risk related to the criteria has to be taken into account as well. Thus, project planning problem can be defined as a multicriteria decision problem under risk. In this paper, a project scheduling problem including time-cost trade-offs is analyzed. We assume that various resource allocations can be considered. A new technique based on computer simulation and interactive approach is proposed. In the first step, simulation experiments are performed to evaluate decision alternatives with respect to the criteria. An interactive technique INSDECM is employed for generating the final solution of the problem. The procedure uses stochastic dominance rules for comparing decision alternatives with respect to the criteria. A numerical example is presented to illustrate the applicability of the technique.
引用
收藏
页码:523 / 539
页数:17
相关论文
共 50 条
  • [1] Stochastic construction time-cost trade-off analysis
    Feng, CW
    Liu, L
    Burns, SA
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2000, 14 (02) : 117 - 126
  • [2] Optimization of construction time-cost trade-off analysis using genetic algorithms
    Hegazy, T
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 1999, 26 (06) : 685 - 697
  • [3] Time-cost trade-off of construction project based on ant colony algorithm
    Xiong, Ying
    Kuang, Ya-Ping
    [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2007, 27 (03): : 105 - 111
  • [4] Time-cost trade-off analysis of project networks in fuzzy environments
    Chen, Shih-Pin
    Tsai, Ming-Jiun
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 212 (02) : 386 - 397
  • [5] CONSTRUCTION TIME-COST TRADE-OFF ANALYSIS USING LP/IP HYBRID METHOD
    LIU, L
    BURNS, SA
    FENG, CW
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (04): : 446 - 454
  • [6] Time-cost Trade-off Analysis of Project Using Fuzzy-Genetic Approach
    Glisovic, Natasa
    [J]. ECONOMICS AND SOCIAL SCIENCE, 2013, 13 : 121 - 126
  • [7] Construction time-cost trade-off analysis using ant colony optimization algorithm
    Kuang Ya-ping
    Xiong Ying
    [J]. PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 2039 - 2044
  • [8] Systematic solution procedure for time-cost trade-off problems
    Udosen, Udosen J.
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2007, 14 (02): : 158 - 168
  • [9] Time-cost trade-off problem in construction project management, based on fuzzy logic
    Abbasnia, R.
    Afshar, A.
    Eshtehardian, E.
    [J]. Journal of Applied Sciences, 2008, 8 (22) : 4159 - 4165
  • [10] An overview of the time-cost trade-off problems of project planning
    Csordas, Helga
    [J]. CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 323 - 326