With the development of BIM technology, BIM provides a new direction for the project management of three objectives. Based on the current situation of the project time cost-optimized mass balance studies, pointing out the implementation mechanism of achieving the trade-off of time-cost-quality in construction project based on BIM mainly oriented components of the BIM model based; the use of Structured Query Language query statistics data information needs combined bill of quantities calculation method for the specification, preliminary engineering scale generation; establishment of Project relations system model. In the process duration is subject, for the construction of uncertainty factors such as interest rates and prices, through the establishment of quality, cost and schedule function, the establishment of quality balanced schedule cost optimization model, using genetic algorithm model of the optimal solution are obtained. With BIM case finally proves the rationality of the model and the effectiveness of the proposed genetic.
引用
收藏
页码:864 / 870
页数:7
相关论文
共 50 条
  • [31] Optimization of environmental impacts of construction projects: a time–cost–quality trade-off approach
    S. A. Banihashemi
    Mohammad Khalilzadeh
    A. Shahraki
    M. Rostami Malkhalifeh
    S. S. R. Ahmadizadeh
    [J]. International Journal of Environmental Science and Technology, 2021, 18 : 631 - 646
  • [32] Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model
    Panwar, Abhilasha
    Jha, Kumar Neeraj
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (02)
  • [33] An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation
    Hu, Wenfa
    He, Xinhua
    [J]. SCIENTIFIC WORLD JOURNAL, 2014,
  • [34] Stochastic construction time-cost trade-off analysis
    Feng, CW
    Liu, L
    Burns, SA
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2000, 14 (02) : 117 - 126
  • [35] Risk Assessment for Discrete Stochastic Time-Cost-Quality Trade-Off Problem Using Simulation-Based Integer Linear Programming Approach
    Mrad, Mehdi
    Al-Gahtani, Khalid S.
    Hulchafo, Rahmeto
    Souayah, Nizar
    Bamatraf, Khaled
    [J]. IEEE ACCESS, 2019, 7 : 32453 - 32463
  • [36] A new approach for production project scheduling with time-cost-quality trade-off considering multi-mode resource-constraints under interval uncertainty
    Ghasemi, M.
    Mousavi, S. M.
    Aramesh, S.
    Shahabi-Shahmiri, R.
    Zavadskas, E. K.
    Antucheviciene, J.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (09) : 2962 - 2984
  • [37] Hybrid time-quality-cost trade-off problems
    Kosztyan, Zsolt T.
    Szalkai, Istvan
    [J]. OPERATIONS RESEARCH PERSPECTIVES, 2018, 5 : 306 - 318
  • [38] Trade-off between quality and cost
    Huang, YF
    [J]. QUALITY & QUANTITY, 2001, 35 (03) : 265 - 276
  • [39] Construction time–cost–resources–quality trade-off optimization using NSGA-III
    Trivedi M.K.
    Sharma K.
    [J]. Asian Journal of Civil Engineering, 2023, 24 (8) : 3543 - 3555
  • [40] Trade-off between Quality and Cost
    Ying-Fang Huang
    [J]. Quality and Quantity, 2001, 35 : 265 - 276