共 50 条
- [2] Multi-mode Time-Cost-Robustness Trade-Off Project Scheduling Problem under Uncertainty [J]. PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 302 - 306
- [3] Solving multi-mode time-cost-quality trade-off problems under generalized precedence relations [J]. OPTIMIZATION METHODS & SOFTWARE, 2015, 30 (05): : 965 - 1001
- [6] Fuzzy Multi-Mode Time-Cost-Quality Trade-Off Optimization in Construction Management of Hydraulic Structure Projects [J]. APPLIED SCIENCES-BASEL, 2022, 12 (12):
- [7] Stochastic Time-Cost-Quality Trade-Off Analysis: The PERT Approach [J]. CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION PROJECT MANAGEMENT, 2018, : 346 - 355
- [8] Study on trade-off of time-cost-quality in construction project based on BIM [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING, 2015, 38 : 864 - 870
- [9] TIME-COST TRADE-OFF SCHEDULING UNDER CONSTRUCTION LABOR RESOURCE CONSTRAINTS [J]. SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2011, 18 (01): : 29 - 39