共 50 条
- [1] Solving multi-mode time-cost-quality trade-off problems under generalized precedence relations [J]. OPTIMIZATION METHODS & SOFTWARE, 2015, 30 (05): : 965 - 1001
- [3] A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction [J]. PLOS ONE, 2016, 11 (12):
- [4] A MULTI-OBJECTIVE MODEL FOR TIME-COST-QUALITY-RISK TRADE-OFF PROBLEMS IN PROJECT MANAGEMENT [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2022, 29 (06): : 826 - 838
- [8] Fuzzy Multi-Mode Time-Cost-Quality Trade-Off Optimization in Construction Management of Hydraulic Structure Projects [J]. APPLIED SCIENCES-BASEL, 2022, 12 (12):
- [9] Multi-mode Time-Cost-Robustness Trade-Off Project Scheduling Problem under Uncertainty [J]. PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 302 - 306