共 50 条
- [41] Genetic Algorithms for Construction Time-Cost-Quality Trade-Off: A Road Project Case Study [J]. IN BO-RICERCHE E PROGETTI PER IL TERRITORIO LA CITTA E L ARCHITETTURA, 2013, 4 (02): : 163 - 176
- [42] Time-cost-quality trade-off model based on genetic algorithms and Pareto ranking [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2010, 30 (10): : 1774 - 1780
- [44] Model mismatch in multi-objective optimisation and preservation of trade-off order [J]. IFAC PAPERSONLINE, 2019, 52 (26): : 249 - 254
- [47] SIMULATION BASED MULTI-OBJECTIVE COST-TIME TRADE-OFF FOR MULTI-FAMILY RESIDENTIAL OFF-SITE CONSTRUCTION [J]. 2015 WINTER SIMULATION CONFERENCE (WSC), 2015, : 3391 - 3401