共 50 条
- [1] Study on trade-off of time-cost-quality in construction project based on BIM [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING, 2015, 38 : 864 - 870
- [2] Fuzzy trade-off of time-cost-quality in construction project and Pareto solution [J]. Tongji Daxue Xuebao/Journal of Tongji University, 2013, 41 (02): : 303 - 308
- [4] Time-Cost-Quality Trade-Off in a Broiler Production Project Using Meta-Heuristic Algorithms: A Case Study [J]. AGRICULTURE-BASEL, 2020, 10 (01):
- [5] Time-cost-quality trade-off model based on genetic algorithms and Pareto ranking [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2010, 30 (10): : 1774 - 1780
- [8] A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction [J]. PLOS ONE, 2016, 11 (12):
- [10] Time, cost and quality trade-off in project management: A case study [J]. Int J Proj Manage, 4 (249-256):