共 50 条
- [1] Genetic Algorithms for Construction Time-Cost-Quality Trade-Off: A Road Project Case Study [J]. IN BO-RICERCHE E PROGETTI PER IL TERRITORIO LA CITTA E L ARCHITETTURA, 2013, 4 (02): : 163 - 176
- [3] Study on trade-off of time-cost-quality in construction project based on BIM [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING, 2015, 38 : 864 - 870
- [4] Fuzzy trade-off of time-cost-quality in construction project and Pareto solution [J]. Tongji Daxue Xuebao/Journal of Tongji University, 2013, 41 (02): : 303 - 308
- [6] CONSTRUCTION MATERIALS-BASED METHODOLOGY FOR TIME-COST-QUALITY TRADE-OFF PROBLEMS [J]. 5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 35 - 41
- [7] A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction [J]. PLOS ONE, 2016, 11 (12):