Trading off Time-Cost-Quality in Construction Project Scheduling Problems with Fuzzy SWARA-TOPSIS Approach

被引:12
|
作者
Banihashemi, Sayyid Ali [1 ]
Khalilzadeh, Mohammad [2 ]
Antucheviciene, Jurgita [3 ]
Saparauskas, Jonas [3 ]
机构
[1] Payame Noor Univ, Dept Ind Engn, Tehran 193954697, Iran
[2] Pontificia Univ Catolica Peru, CENTRUM Catolica Grad Business Sch, Lima 15023, Peru
[3] Vilnius Gediminas Tech Univ, Dept Construct Management & Real Estate, Sauletekio Al 11, LT-10223 Vilnius, Lithuania
关键词
project schedule management; time-cost-quality trade-off; MCDM; fuzzy SWARA; fuzzy TOPSIS; construction industry; OFF PROBLEM; RISK-ASSESSMENT; DISCRETE-TIME; MODEL; SELECTION; UNCERTAINTY; MULTICRITERIA; OPTIMIZATION; MANAGEMENT; ALGORITHM;
D O I
10.3390/buildings11090387
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The increasing number of construction projects together with the limited resources of organizations led to tough competition for achieving project goals. Time, cost, and quality have been known as the project iron triangle. Project managers attempt to allocate the appropriate resources and make the best decisions for accomplishing projects with the shortest durations, lowest costs, and the highest quality. No study has examined the time-cost-quality trade-off problem with decision-making approaches. In this study, the fuzzy multi-criteria decision-making (MCDM) methods are exploited to choose the best mode for performing each activity. For this purpose, the SWARA method is applied to determine the importance weights of time, cost, and quality. In addition, the TOPSIS (Technique for the Order Preference by Similarity to Ideal Solution) technique is used to rank and select the best activity execution modes. The proposed model is implemented on two medium- and large-size construction projects to evaluate its efficiency. Several execution modes with fuzzy duration, cost, and quality are considered for each project activity. Finally, sensitivity analysis is conducted taking three different conditions into account: the shortest duration of the execution modes, the lowest cost of the execution modes, and the highest quality of execution modes for each activity. The solution of each trade-off is compared with the solution obtained from the fuzzy SWARA-TOPSIS method. The schedule is developed according to the best execution mode for each project activity. The obtained results in two different construction projects show significant improvements in the overall project objectives so that the projects can be completed in fewer durations and costs along with higher quality. Because of the higher importance of cost, the cost of each activity is closer to the lowest cost. The activity duration is also closer to the most likely duration, and quality is closer to the high-quality level. The application of this approach can create new opportunities for research and knowledge development in the field of construction project scheduling.
引用
收藏
页数:24
相关论文
共 50 条
  • [1] Fuzzy trade-off of time-cost-quality in construction project and Pareto solution
    Zhang, Lianying
    Yue, Yan
    [J]. Tongji Daxue Xuebao/Journal of Tongji University, 2013, 41 (02): : 303 - 308
  • [2] Fuzzy tradeoff optimization of time-cost-quality in construction project
    Management School, Xi'an Jiaotong University, Xi'an 710049, China
    [J]. Xitong Gongcheng Lilum yu Shijian, 2006, 7 (112-117):
  • [3] A fuzzy clustering-based genetic algorithm approach for time-cost-quality trade-off problems: A case study of highway construction project
    Mungle, Santosh
    Benyoucef, Lyes
    Son, Young-Jun
    Tiwari, M. K.
    [J]. ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2013, 26 (08) : 1953 - 1966
  • [4] A New Approach to Time-Cost-Quality Tradeoff Problem for Construction Project
    Fu Fang
    Zhang Chao
    [J]. 2014 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (ICMSE), 2014, : 1836 - 1842
  • [5] Application of NSGA-II and fuzzy TOPSIS to time-cost-quality trade-off resource leveling for scheduling an agricultural water supply project
    Sadeghi, R.
    Heidari, A.
    Zahedi, F.
    Khordehbinan, M. W.
    Khalilzadeh, M.
    [J]. INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2023, 20 (10) : 10633 - 10660
  • [6] Study on trade-off of time-cost-quality in construction project based on BIM
    Xu Yongge
    Wei Ya
    [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING, 2015, 38 : 864 - 870
  • [7] A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction
    Fu, Fang
    Zhang, Tao
    [J]. PLOS ONE, 2016, 11 (12):
  • [8] Project Time-Cost-Quality Trade-off Problem: A Novel Approach Based on Fuzzy Decision Making
    Keshavarz, Esmaeil
    Shoul, Abbas
    [J]. INTERNATIONAL JOURNAL OF UNCERTAINTY FUZZINESS AND KNOWLEDGE-BASED SYSTEMS, 2020, 28 (04) : 545 - 567
  • [9] CONSTRUCTION MATERIALS-BASED METHODOLOGY FOR TIME-COST-QUALITY TRADE-OFF PROBLEMS
    Kazaz, Aynur
    Ulubeyli, Serdar
    Bayram, E. R.
    Acikara, Turgut
    [J]. 5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 35 - 41
  • [10] Time-cost-quality trade-off analysis for highway construction
    El-Rayes, K
    Kandil, A
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (04) : 477 - 486