The risk element transmission theory research of multi-objective risk-time-cost trade-off

被引:11
|
作者
Li, Cunbin [1 ]
Wang, Kecheng [1 ]
机构
[1] N China Elect Power Univ, Inst Management, Beijing 102206, Peoples R China
基金
中国国家自然科学基金;
关键词
Multiple objective optimization; Markov processes; RBF neural network; Risk element; Transmission; ADAPTIVE PATTERN-CLASSIFICATION; NETWORKS; PATH;
D O I
10.1016/j.camwa.2008.10.051
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
Risk management project is an important aspect of general project risk element transmission theory. To solve the multi-objective time-cost trade-off problem considering the risk elements effectively, this paper establishes an analytical model for multi-objective risk-time-cost trade-off problem based on general project risk element transmission theory. We divide risk elements into discrete model and continuous model to be discussed separately, and the two models for multi-objective risk-time-cost trade-off problem are established by taking Markov dynamic PERT network into classical PERT network. Thus, we combine Radial Basis Function (RBF) neural network to solve the discrete model of the problem. Finally, a practical example illustrates the effectiveness of the algorithm. Crown Copyright (C) 2008 Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:1792 / 1799
页数:8
相关论文
共 50 条
  • [1] A MULTI-OBJECTIVE MODEL FOR TIME-COST-QUALITY-RISK TRADE-OFF PROBLEMS IN PROJECT MANAGEMENT
    Avsar, Melis Mine Sener
    Onut, Semih
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2022, 29 (06): : 826 - 838
  • [2] A Multi-objective Genetic Algorithm for Optimization Time-Cost Trade-off Scheduling
    Aghassi, Hadi
    Abadi, Sedigheh Nader
    Roghanian, Emad
    [J]. KNOWLEDGE TECHNOLOGY, 2012, 295 : 356 - +
  • [3] Time and Cost trade-off using multi-objective task scheduling in utility Grids
    Alemzadeh, Shiva
    Dastghaibyfard, Gh.
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON COMPUTER AND KNOWLEDGE ENGINEERING (ICCKE 2013), 2013, : 362 - 367
  • [4] Multi-objective time-cost trade-off optimization for the construction scheduling with Rao algorithms
    Yilmaz, Mehmet
    Dede, Tayfun
    [J]. STRUCTURES, 2023, 48 : 798 - 808
  • [5] A multi-objective decision making model based on TLBO for the time - cost trade-off problems
    Eirgash, Mohammad A.
    Togan, Vedat
    Dede, Tayfun
    [J]. STRUCTURAL ENGINEERING AND MECHANICS, 2019, 71 (02) : 139 - 151
  • [6] An integrated multi-objective optimization model for solving the construction time-cost trade-off problem
    Koo, Choongwan
    Hong, Taehoon
    Kim, Sangbum
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2015, 21 (03) : 323 - 333
  • [7] Fuzzy Multi-objective Programming Application for Time-Cost Trade-off of CPM in Project Management
    Yang, Gino K.
    [J]. COMPUTATIONAL COLLECTIVE INTELLIGENCE: TECHNOLOGIES AND APPLICATIONS, PT I, 2010, 6421 : 215 - 229
  • [8] A Multi-objective Stochastic Programming Approach for Project Time, Cost and Quality Trade-off Problem (TCQTP)
    Ahadian, Behrooz
    Veisy, Omid
    Azizi, Vahid
    [J]. JORDAN JOURNAL OF CIVIL ENGINEERING, 2016, 10 (04) : 553 - 563
  • [9] Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach
    Azaron, Amir
    Tavakkoli-Moghaddam, Reza
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 180 (03) : 1186 - 1200
  • [10] Hybrid multiple objective evolutionary algorithms for optimising multi-mode time, cost and risk trade-off problem
    Luong Duc Long
    Duc-Hoc Tran
    Phong Thanh Nguyen
    [J]. INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2019, 60 (03) : 203 - 214