Study on trade-off of time-cost-quality in construction project based on BIM

被引:0
|
作者
Xu Yongge [1 ]
Wei Ya [1 ]
机构
[1] Xian Univ Arch & Tech, Xian 710055, Peoples R China
关键词
Building information modeling; Construction project; Time-cost-quality trade-off optimization; Genetic algorithm;
D O I
暂无
中图分类号
C [社会科学总论];
学科分类号
03 ; 0303 ;
摘要
With the development of BIM technology, BIM provides a new direction for the project management of three objectives. Based on the current situation of the project time cost-optimized mass balance studies, pointing out the implementation mechanism of achieving the trade-off of time-cost-quality in construction project based on BIM mainly oriented components of the BIM model based; the use of Structured Query Language query statistics data information needs combined bill of quantities calculation method for the specification, preliminary engineering scale generation; establishment of Project relations system model. In the process duration is subject, for the construction of uncertainty factors such as interest rates and prices, through the establishment of quality, cost and schedule function, the establishment of quality balanced schedule cost optimization model, using genetic algorithm model of the optimal solution are obtained. With BIM case finally proves the rationality of the model and the effectiveness of the proposed genetic.
引用
收藏
页码:864 / 870
页数:7
相关论文
共 50 条
  • [11] Presenting a goal programming model in the time-cost-quality trade-off
    Hamta, Nima
    Ehsanifar, Mohammad
    Sarikhani, Javad
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (01) : 1 - 11
  • [12] Stochastic Time-Cost-Quality Trade-Off Analysis: The PERT Approach
    Hosny, Ossama
    Elbassuony, Mahmoud
    [J]. CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION PROJECT MANAGEMENT, 2018, : 346 - 355
  • [13] Time-cost-quality trade-off model based on genetic algorithms and Pareto ranking
    Chen, Yong-Qiang
    Gao, Ming
    Zhang, Lian-Ying
    [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2010, 30 (10): : 1774 - 1780
  • [14] Time-Cost-Quality Trade-Off in a Broiler Production Project Using Meta-Heuristic Algorithms: A Case Study
    Moghadam, Erfan Khosravani
    Sharifi, Mohammad
    Rafiee, Shahin
    Chang, Young Ki
    [J]. AGRICULTURE-BASEL, 2020, 10 (01):
  • [15] Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization
    Zhang, Lianying
    Du, Jingjing
    Zhang, Shushan
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (02) : 163 - 172
  • [16] Time, cost and quality trade-off in project management: A case study
    Asia Inst of Technology, Bangkok, Thailand
    [J]. Int J Proj Manage, 4 (249-256):
  • [17] Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution
    Duc-Long Luong
    Duc-Hoc Tran
    Phong Thanh Nguyen
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (03) : 271 - 283
  • [18] Application of Three Metaheuristic Algorithms to Time-Cost-Quality Trade-Off Project Scheduling Problem for Construction Projects Considering Time Value of Money
    Kebriyaii, Omid
    Heidari, Ali
    Khalilzadeh, Mohammad
    Antucheviciene, Jurgita
    Pavlovskis, Miroslavas
    [J]. SYMMETRY-BASEL, 2021, 13 (12):
  • [19] A novel multi criteria decision making model for optimizing time-cost-quality trade-off problems in construction projects
    Monghasemi, Shahryar
    Nikoo, Mohammad Reza
    Fasaee, Mohammad Ali Khaksar
    Adamowski, Jan
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (06) : 3089 - 3104
  • [20] Time-cost-quality trade-off software by using simplified Genetic algorithm for typical-repetitive construction projects
    Abd El Razek, Refaat H.
    Diab, Ahmed M.
    Hafez, Sherif M.
    Aziz, Remon F.
    [J]. World Academy of Science, Engineering and Technology, 2010, 61 : 312 - 321