Presenting a goal programming model in the time-cost-quality trade-off

被引:24
|
作者
Hamta, Nima [1 ]
Ehsanifar, Mohammad [2 ]
Sarikhani, Javad [2 ]
机构
[1] Arak Univ Technol, Dept Mech Engn, Arak, Iran
[2] Islamic Azad Univ, Dept Ind Engn, Arak Branch, Arak, Iran
关键词
Goal programming; time-cost-quality trade-off; project management; multi-objective decision model; PROJECT; OPTIMIZATION;
D O I
10.1080/15623599.2018.1502930
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Time, cost and quality are important objectives of each project, which project managers are always looking for completion of them in the shortest possible time, with the lowest cost and highest quality to be succeeded in the projects. One of the main challenges in this case is choosing the right approach to achieve these objectives. In this regard, the most commonly used approach is the use of balancing method. Indeed, using this method can be the most optimal mode of project implementation activities that the lowest and highest quality at the lowest cost, time has obtained. In this paper, a goal programming model is developed to find suitable solutions to manage the cost, time and quality of the project. In order to examine the developed model, a case study has been accomplished in the project implemented by Arak Machine Sazi Company. Computational results show the applicability of the model and the efficiency of proposed method.
引用
收藏
页码:1 / 11
页数:11
相关论文
共 50 条
  • [1] A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction
    Fu, Fang
    Zhang, Tao
    [J]. PLOS ONE, 2016, 11 (12):
  • [2] Time-cost-quality trade-off analysis for highway construction
    El-Rayes, K
    Kandil, A
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (04) : 477 - 486
  • [3] An Integer Grey Goal Programming For Project Time, Cost and Quality Trade-Off
    Hajiagha, Seyed Hossein Razavi
    Akrami, Hadi
    Hashemi, Shide Sadat
    Mahdiraji, Hannan Amoozad
    [J]. INZINERINE EKONOMIKA-ENGINEERING ECONOMICS, 2015, 26 (01): : 93 - 100
  • [4] Time-cost-quality trade-off analysis for planning construction projects
    Wang, Tianqi
    Abdallah, Moatassem
    Clevenger, Caroline
    Monghasemi, Shahryar
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (01) : 82 - 100
  • [5] Time-cost-quality trade-off model based on genetic algorithms and Pareto ranking
    Chen, Yong-Qiang
    Gao, Ming
    Zhang, Lian-Ying
    [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2010, 30 (10): : 1774 - 1780
  • [6] Stochastic Time-Cost-Quality Trade-Off Analysis: The PERT Approach
    Hosny, Ossama
    Elbassuony, Mahmoud
    [J]. CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION PROJECT MANAGEMENT, 2018, : 346 - 355
  • [7] Study on trade-off of time-cost-quality in construction project based on BIM
    Xu Yongge
    Wei Ya
    [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING, 2015, 38 : 864 - 870
  • [8] Fuzzy trade-off of time-cost-quality in construction project and Pareto solution
    Zhang, Lianying
    Yue, Yan
    [J]. Tongji Daxue Xuebao/Journal of Tongji University, 2013, 41 (02): : 303 - 308
  • [9] A GOAL PROGRAMMING-MODEL FOR PROJECT CRASHING WITH PIECEWISE LINEAR TIME COST TRADE-OFF
    VRAT, P
    KRIENGKRAIRUT, C
    [J]. ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1986, 10 (02): : 161 - 172
  • [10] CONSTRUCTION MATERIALS-BASED METHODOLOGY FOR TIME-COST-QUALITY TRADE-OFF PROBLEMS
    Kazaz, Aynur
    Ulubeyli, Serdar
    Bayram, E. R.
    Acikara, Turgut
    [J]. 5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 35 - 41