共 50 条
- [1] A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction [J]. PLOS ONE, 2016, 11 (12):
- [3] An Integer Grey Goal Programming For Project Time, Cost and Quality Trade-Off [J]. INZINERINE EKONOMIKA-ENGINEERING ECONOMICS, 2015, 26 (01): : 93 - 100
- [5] Time-cost-quality trade-off model based on genetic algorithms and Pareto ranking [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2010, 30 (10): : 1774 - 1780
- [6] Stochastic Time-Cost-Quality Trade-Off Analysis: The PERT Approach [J]. CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION PROJECT MANAGEMENT, 2018, : 346 - 355
- [7] Study on trade-off of time-cost-quality in construction project based on BIM [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING, 2015, 38 : 864 - 870
- [8] Fuzzy trade-off of time-cost-quality in construction project and Pareto solution [J]. Tongji Daxue Xuebao/Journal of Tongji University, 2013, 41 (02): : 303 - 308
- [9] A GOAL PROGRAMMING-MODEL FOR PROJECT CRASHING WITH PIECEWISE LINEAR TIME COST TRADE-OFF [J]. ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1986, 10 (02): : 161 - 172
- [10] CONSTRUCTION MATERIALS-BASED METHODOLOGY FOR TIME-COST-QUALITY TRADE-OFF PROBLEMS [J]. 5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 35 - 41