Presenting a goal programming model in the time-cost-quality trade-off

被引:24
|
作者
Hamta, Nima [1 ]
Ehsanifar, Mohammad [2 ]
Sarikhani, Javad [2 ]
机构
[1] Arak Univ Technol, Dept Mech Engn, Arak, Iran
[2] Islamic Azad Univ, Dept Ind Engn, Arak Branch, Arak, Iran
关键词
Goal programming; time-cost-quality trade-off; project management; multi-objective decision model; PROJECT; OPTIMIZATION;
D O I
10.1080/15623599.2018.1502930
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Time, cost and quality are important objectives of each project, which project managers are always looking for completion of them in the shortest possible time, with the lowest cost and highest quality to be succeeded in the projects. One of the main challenges in this case is choosing the right approach to achieve these objectives. In this regard, the most commonly used approach is the use of balancing method. Indeed, using this method can be the most optimal mode of project implementation activities that the lowest and highest quality at the lowest cost, time has obtained. In this paper, a goal programming model is developed to find suitable solutions to manage the cost, time and quality of the project. In order to examine the developed model, a case study has been accomplished in the project implemented by Arak Machine Sazi Company. Computational results show the applicability of the model and the efficiency of proposed method.
引用
收藏
页码:1 / 11
页数:11
相关论文
共 50 条
  • [21] Multi-Objective Optimization of Construction Project Time-Cost-Quality Trade-off Using Differential Evolution Algorithm
    Narayanan, A. Sathya
    Suribabu, C. R.
    [J]. JORDAN JOURNAL OF CIVIL ENGINEERING, 2014, 8 (04) : 375 - 392
  • [22] Time-cost-quality trade-off software by using simplified Genetic algorithm for typical-repetitive construction projects
    Abd El Razek, Refaat H.
    Diab, Ahmed M.
    Hafez, Sherif M.
    Aziz, Remon F.
    [J]. World Academy of Science, Engineering and Technology, 2010, 61 : 312 - 321
  • [23] Time-Cost-Quality Trade-Off in a Broiler Production Project Using Meta-Heuristic Algorithms: A Case Study
    Moghadam, Erfan Khosravani
    Sharifi, Mohammad
    Rafiee, Shahin
    Chang, Young Ki
    [J]. AGRICULTURE-BASEL, 2020, 10 (01):
  • [24] Fuzzy Multi-Mode Time-Cost-Quality Trade-Off Optimization in Construction Management of Hydraulic Structure Projects
    Mendomo Meye, Serges
    Li, Guowei
    Shen, Zhenzhong
    Zhang, Jingbin
    [J]. APPLIED SCIENCES-BASEL, 2022, 12 (12):
  • [25] Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization
    Zhang, Lianying
    Du, Jingjing
    Zhang, Shushan
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (02) : 163 - 172
  • [26] Trade-off model among time, quality and cost for business process reengineering
    Zhou, Yong-Hua
    Chen, Yu-Liu
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2002, 8 (04): : 269 - 273
  • [27] A new multi-objective multi-mode model for solving preemptive time-cost-quality trade-off project scheduling problems
    Tavana, Madjid
    Abtahi, Amir-Reza
    Khalili-Damghani, Kaveh
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2014, 41 (04) : 1830 - 1846
  • [28] Hybrid time-quality-cost trade-off problems
    Kosztyan, Zsolt T.
    Szalkai, Istvan
    [J]. OPERATIONS RESEARCH PERSPECTIVES, 2018, 5 : 306 - 318
  • [29] Trade-off between quality and cost
    Huang, YF
    [J]. QUALITY & QUANTITY, 2001, 35 (03) : 265 - 276
  • [30] Trade-off between Quality and Cost
    Ying-Fang Huang
    [J]. Quality and Quantity, 2001, 35 : 265 - 276