An Integer Grey Goal Programming For Project Time, Cost and Quality Trade-Off

被引:20
|
作者
Hajiagha, Seyed Hossein Razavi [1 ]
Akrami, Hadi [2 ]
Hashemi, Shide Sadat [3 ]
Mahdiraji, Hannan Amoozad [3 ]
机构
[1] Khatam Inst Higher Educ, Tehran, Iran
[2] EN Bank, Tehran 1968655944, Iran
[3] Islamic Azad Univ, Dept Management, Kashan Branch, Kashan, Iran
来源
关键词
the iron triangle; project management; time; cost and quality trade-off; grey numbers; integer goal programming; EFFICIENT SOLUTIONS; MANAGEMENT;
D O I
10.5755/j01.ee.26.1.4633
中图分类号
F [经济];
学科分类号
02 ;
摘要
Project management (PM) is one of the prominent fields in business and industry. Every task of an organization can be imagined as a project, being a coordinated set of activities toward a common goal. One important aspect of PM is analysing the information related to the optimum balance among the project's objectives. Each project is a combination of different activities, being connected to each other and having several success criteria, among which the time, cost and quality of the project completion are more significant, due to their significant effect on obtained results. Accordingly, the time might lead to delay and penalty which means more cost; and cost may be underestimated than real required funds. They both will lead to failure in project management. On the other hand, quality is the final key which confirms the success. The aim of a time-cost-quality trade-off problem (TCQTP) is to select a set of activities and an appropriate execution mode for each activity; the cost and time of the project is minimized while the project quality is maximized. The purpose of this paper is to present a model for TCQTP in which these parameters are approximated by grey numbers. Since there are various modes to accomplish each activity, the trade-off problem is formulated based upon a multiobjective integer grey programming model. Afterwards, a goal programming-based approach is designed to solve this model. The model's results provide a framework for the project manager to manage his/her project successfully, in acceptable time, with the lowest cost and the highest quality. The main originality of the proposed model is the approximation of time, cost and quality parameters of activities mode with grey numbers and the development of a two phase goal programming-based approach to solve this problem. Ultimately, the proposed model is applied in two different cases and results are illustrated to clarify the outstanding capabilities of the model.
引用
收藏
页码:93 / 100
页数:8
相关论文
共 50 条
  • [1] Presenting a goal programming model in the time-cost-quality trade-off
    Hamta, Nima
    Ehsanifar, Mohammad
    Sarikhani, Javad
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (01) : 1 - 11
  • [2] A GOAL PROGRAMMING-MODEL FOR PROJECT CRASHING WITH PIECEWISE LINEAR TIME COST TRADE-OFF
    VRAT, P
    KRIENGKRAIRUT, C
    [J]. ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1986, 10 (02): : 161 - 172
  • [3] Time, cost and quality trade-off in project management: A case study
    Asia Inst of Technology, Bangkok, Thailand
    [J]. Int J Proj Manage, 4 (249-256):
  • [4] A Multi-objective Stochastic Programming Approach for Project Time, Cost and Quality Trade-off Problem (TCQTP)
    Ahadian, Behrooz
    Veisy, Omid
    Azizi, Vahid
    [J]. JORDAN JOURNAL OF CIVIL ENGINEERING, 2016, 10 (04) : 553 - 563
  • [5] Time-Quality-Cost Trade-Off Optimization and Application in Engineering Project
    Dong Na
    Liang Chuan
    Guo Chun-xiang
    Zou Zuo-jing
    [J]. EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1597 - +
  • [6] A fuzzy goal programming model for time, cost, and quality trade-off problem in metro construction projects considering sustainable development
    Hashemi, Reza
    Shahbandarzadeh, Hamid
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (03) : 323 - 330
  • [7] Linear programming based approaches for the discrete time/cost trade-off problem in project networks
    Hafizoglu, A. B.
    Azizoglu, M.
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2010, 61 (04) : 676 - 685
  • [8] Fuzzy trade-off of time-cost-quality in construction project and Pareto solution
    Zhang, Lianying
    Yue, Yan
    [J]. Tongji Daxue Xuebao/Journal of Tongji University, 2013, 41 (02): : 303 - 308
  • [9] Study on trade-off of time-cost-quality in construction project based on BIM
    Xu Yongge
    Wei Ya
    [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING, 2015, 38 : 864 - 870
  • [10] On the discrete time, cost and quality trade-off problem
    Tareghian, Hamed R.
    Taheri, Seyyed Hassan
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2006, 181 (02) : 1305 - 1312