共 50 条
- [1] A New Approach to Time-Cost-Quality Tradeoff Problem for Construction Project [J]. 2014 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (ICMSE), 2014, : 1836 - 1842
- [2] Study on trade-off of time-cost-quality in construction project based on BIM [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING, 2015, 38 : 864 - 870
- [3] An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation [J]. SCIENTIFIC WORLD JOURNAL, 2014,
- [4] Study on the Cost Management of the Construction Project's Life Cycle [J]. 2013 FOURTH INTERNATIONAL CONFERENCE ON DIGITAL MANUFACTURING AND AUTOMATION (ICDMA), 2013, : 1308 - 1310
- [5] System of Sustainable Construction Based on Project Whole Life Cycle Management [J]. MEMS, NANO AND SMART SYSTEMS, PTS 1-6, 2012, 403-408 : 2093 - +
- [6] Application of Time-Cost-Quality Tradeoff Optimization Model Based on Improved PSO Algorithm to Construction Project [J]. 2009 ASIA-PACIFIC CONFERENCE ON INFORMATION PROCESSING (APCIP 2009), VOL 2, PROCEEDINGS, 2009, : 298 - 301
- [7] Study on Cost Control of Construction Project Based on Whole Life Cycle Theory [J]. PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 254 - +
- [8] Ti time-cost-quality tradeoff optimization in construction project based on modified ant colony algorithm [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2008, : 1031 - 1035
- [9] Genetic Algorithms for Construction Time-Cost-Quality Trade-Off: A Road Project Case Study [J]. IN BO-RICERCHE E PROGETTI PER IL TERRITORIO LA CITTA E L ARCHITETTURA, 2013, 4 (02): : 163 - 176
- [10] Research on the System of the Construction Project Life Cycle Cost Risk Management [J]. ADVANCES IN STRUCTURAL ENGINEERING, PTS 1-3, 2011, 94-96 : 2329 - 2332