Study on the Risk Management of Expressway BOT Project

被引:0
|
作者
Wang Shufang [1 ]
Yang Chengzhong [1 ]
机构
[1] E China Jiaotong Univ, Civil & Architecture Sch, Nanchang, Peoples R China
关键词
Risk Management; BOT Project; Expressway; Financing; Enterprise Benefit; Government;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
On the analysis of the literature material and research basis, the expressway BUT project risk characteristics are summarized. From the universality and particularity of risk, the risk characteristics of expressway BOT project are analyzed; Based on the analysis of the existing situation in implementation of expressway BUT project, it is pointed out that, imperfect laws and regulations related, lack of imperfect market, earning ratio not be guaranteed, improper managing yardstick of government and indeterminate responsibility to share risks are the main problems in the expressway BUT project in China. Establishing risk awareness, improving market system, improving laws and regulations related, sharing risk reasonably as well as training and introducing professional risk management professionals, deepening the expressway BUT system reformation, improving the market system, strengthening contract management and sharing the risk rationally are the effective countermeasures in the risk management in expressway BUT project.
引用
收藏
页码:84 / 88
页数:5
相关论文
共 50 条
  • [1] A study on risk management for the private enterprises investing in expressway BOT project
    Xiong, Xiaoguo
    [J]. PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2011, : 451 - 454
  • [2] Research of Risk Management on XY Expressway BOT Project
    Wang, Qiu-ju
    Xue, Da-shen
    [J]. INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND SOFTWARE ENGINEERING (AISE 2014), 2014, : 271 - 276
  • [3] Study on risk evaluation index system to expressway BOT project
    Xie, Zhonghui
    Li, Shucheng
    Du, Peng
    [J]. Sixth Wuhan International Conference on E-Business, Vols 1-4: MANAGEMENT CHALLENGES IN A GLOBAL WORLD, 2007, : 1638 - 1643
  • [4] The Model of Risk Allocation in BOT Expressway Project
    Yun, Chen
    Wei, Tang
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL III, 2008, : 283 - 286
  • [5] Study on the Mechanism of Expressway BOT Project Rate Determination
    Mu, Yi
    [J]. 2013 3RD INTERNATIONAL CONFERENCE ON EDUCATION AND EDUCATION MANAGEMENT (EEM 2013), 2013, 26 : 718 - 722
  • [6] Risk Assessment of Expressway BOT Project Based on Grey Hierarchy Theory
    Hu Yuting
    Mu Lan
    Liu Zhanliang
    [J]. ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 16 - +
  • [7] Evaluation Research on policy risk of BOT project in Expressway Based on Structural Equation
    Bing, Xu
    Lu, Liu
    [J]. REGIONAL DEVELOPMENT AND RISK MANAGEMENT IN THE WEST OF CHINA, 2012, : 165 - 171
  • [8] The research of risk management of BOT investment project
    Chen Ling
    [J]. Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 964 - 967
  • [9] BOT Project Risk Estimation
    Liu, Ning
    Liu, Yachen
    Yu, Xiaosi
    [J]. EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 2041 - 2044
  • [10] Risk Analysis for a BOT Project
    Bagui, Swapan Kumar
    Ghosh, Ambarish
    [J]. JORDAN JOURNAL OF CIVIL ENGINEERING, 2011, 5 (03) : 330 - 342