Study on the Mechanism of Expressway BOT Project Rate Determination

被引:0
|
作者
Mu, Yi [1 ]
机构
[1] Southwest Jiao Tong Univ, Publ Adm, Chengdu 610031, Peoples R China
关键词
BOT; Expressway; Rate to determine the mechanism; ROAD NETWORK;
D O I
暂无
中图分类号
C [社会科学总论];
学科分类号
03 ; 0303 ;
摘要
With the privatization of infrastructure investment, private capital investment in infrastructure projects has become an effective way to alleviate the financial burden on the government, BOT (Build-Operate-Transfer) is one of the investment modes. The emergence of BOT mode, has made a significant contribution to the infrastructure construction, but many problems also appeared in the process of operation. How to determine the rate of BOT project is one of the problems, it is also one of the most controversial and the most pressing question. How to determine the rate mechanism, this article made a detailed research from the government, the item company and the road users of the three parties.
引用
下载
收藏
页码:718 / 722
页数:5
相关论文
共 50 条
  • [1] Study on the Risk Management of Expressway BOT Project
    Wang Shufang
    Yang Chengzhong
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 84 - 88
  • [2] Study on risk evaluation index system to expressway BOT project
    Xie, Zhonghui
    Li, Shucheng
    Du, Peng
    Sixth Wuhan International Conference on E-Business, Vols 1-4: MANAGEMENT CHALLENGES IN A GLOBAL WORLD, 2007, : 1638 - 1643
  • [3] The Model of Risk Allocation in BOT Expressway Project
    Yun, Chen
    Wei, Tang
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL III, 2008, : 283 - 286
  • [4] A study on risk management for the private enterprises investing in expressway BOT project
    Xiong, Xiaoguo
    PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2011, : 451 - 454
  • [5] Research of Risk Management on XY Expressway BOT Project
    Wang, Qiu-ju
    Xue, Da-shen
    INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND SOFTWARE ENGINEERING (AISE 2014), 2014, : 271 - 276
  • [6] Risk Assessment of Expressway BOT Project Based on Grey Hierarchy Theory
    Hu Yuting
    Mu Lan
    Liu Zhanliang
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 16 - +
  • [7] Evaluation Research on policy risk of BOT project in Expressway Based on Structural Equation
    Bing, Xu
    Lu, Liu
    REGIONAL DEVELOPMENT AND RISK MANAGEMENT IN THE WEST OF CHINA, 2012, : 165 - 171
  • [8] Mechanism Study of conflict analysis and countermeasure about BOT project organization
    Zhao Liku
    SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT, PTS 1-3, 2012, 209-211 : 1429 - 1432
  • [9] The Mechanism Design of Traffic BOT Project Auction
    Yan, Pei-Sheng
    Wang, Xian-Jia
    FIRST IITA INTERNATIONAL JOINT CONFERENCE ON ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2009, : 23 - 26
  • [10] The Study on Expressway Reconstruction project of China
    Yi, Yuan Chun
    SUSTAINABLE DEVELOPMENT OF URBAN INFRASTRUCTURE, PTS 1-3, 2013, 253-255 : 1139 - 1146