Study on the Mechanism of Expressway BOT Project Rate Determination

被引:0
|
作者
Mu, Yi [1 ]
机构
[1] Southwest Jiao Tong Univ, Publ Adm, Chengdu 610031, Peoples R China
关键词
BOT; Expressway; Rate to determine the mechanism; ROAD NETWORK;
D O I
暂无
中图分类号
C [社会科学总论];
学科分类号
03 ; 0303 ;
摘要
With the privatization of infrastructure investment, private capital investment in infrastructure projects has become an effective way to alleviate the financial burden on the government, BOT (Build-Operate-Transfer) is one of the investment modes. The emergence of BOT mode, has made a significant contribution to the infrastructure construction, but many problems also appeared in the process of operation. How to determine the rate of BOT project is one of the problems, it is also one of the most controversial and the most pressing question. How to determine the rate mechanism, this article made a detailed research from the government, the item company and the road users of the three parties.
引用
下载
收藏
页码:718 / 722
页数:5
相关论文
共 50 条
  • [31] Formation Mechanism and Stability Analysis of Bei'an-Heihe Expressway Expansion Project K178 Landslide
    Jiang, Hua
    Shan, Wei
    ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 953 - 958
  • [32] Study on determination of demand intensity for tourist transit of open expressway service area
    Liu, Yong
    Lin, Ying
    Zhang, Runmin
    Zhong, Chunmei
    International Journal of u- and e- Service, Science and Technology, 2016, 9 (04) : 111 - 124
  • [33] Performance Evaluation of Construction Materials Management in Expressway Project
    Chen Yun
    Li Jingjing
    MATERIALS SCIENCE AND ENGINEERING, PTS 1-2, 2011, 179-180 : 475 - 481
  • [34] Research on incentive mechanism and supervision mechanism of expressway owner to agent
    Zhao, Wen-Yi
    Wang, Xuan-Cang
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2009, 22 (02): : 111 - 115
  • [35] Calculation of The Concession Period for Generalized BOT Project
    Xie, Lifang
    Xu, Weiwei
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 9720 - 9723
  • [37] Evaluation on Risk Analysis for Oversea BOT Project
    An Yuhua
    Ding Xiaoxin
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 221 - 225
  • [38] A research on the risks and prevention strategies of BOT project
    Yang Aijie
    Proceedings of 2005 International Conference on Innovation & Management, 2005, : 1167 - 1171
  • [39] A Flexible Franchise Fee Scheme in a BOT Project
    Chiang, Yao-Min
    INTERNATIONAL REAL ESTATE REVIEW, 2012, 15 (01): : 127 - 139
  • [40] Analyses on the Credit Enhancement of BOT Project Finance
    Zhang, Zhi-Ying
    Teng, Jing
    Fu, Qin
    Zou, Wan-Ling
    PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND MANAGEMENT INNOVATION, 2014, : 453 - 457