A study on risk management for the private enterprises investing in expressway BOT project

被引:0
|
作者
Xiong, Xiaoguo [1 ]
机构
[1] Guangxi Univ, Sch Business, Nanning 530004, Peoples R China
关键词
BOT; expressway project; risk management; private enterprise;
D O I
暂无
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In recent years, the expressway construction attained considerable increase in China. Instead of the single mode of "government investment and operation", innovations of various modes are implemented in the management and financing system of expressway constructions, covering the diversified sources of investment, the financing channels and methods, a transfer of the right of toll collection. The BOT project is one of the most popular practice mode in private financial initiative modes. However, there are some investment risks and issues in implementing expressway BOT project. Targeting at minimizing various investment risks and ensuring the benefits of investors, the article tries to analyze more effective risk management modes of expressway BOT project from the perspective of private enterprise, which will have practical significance for the development of expressway construction in China.
引用
下载
收藏
页码:451 / 454
页数:4
相关论文
共 50 条
  • [1] Study on the Risk Management of Expressway BOT Project
    Wang Shufang
    Yang Chengzhong
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 84 - 88
  • [2] Research of Risk Management on XY Expressway BOT Project
    Wang, Qiu-ju
    Xue, Da-shen
    INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND SOFTWARE ENGINEERING (AISE 2014), 2014, : 271 - 276
  • [3] Study of risk management of private enterprises' involvement in BOT projects: a case study of a sludge treatment project
    Sheng, H. (shenghetai@tsinghua.org.cn), 1600, Editorial Office of China Civil Engineering Journal (45):
  • [4] Study on risk evaluation index system to expressway BOT project
    Xie, Zhonghui
    Li, Shucheng
    Du, Peng
    Sixth Wuhan International Conference on E-Business, Vols 1-4: MANAGEMENT CHALLENGES IN A GLOBAL WORLD, 2007, : 1638 - 1643
  • [5] The Model of Risk Allocation in BOT Expressway Project
    Yun, Chen
    Wei, Tang
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL III, 2008, : 283 - 286
  • [6] Study on the Mechanism of Expressway BOT Project Rate Determination
    Mu, Yi
    2013 3RD INTERNATIONAL CONFERENCE ON EDUCATION AND EDUCATION MANAGEMENT (EEM 2013), 2013, 26 : 718 - 722
  • [7] Risk Assessment of Expressway BOT Project Based on Grey Hierarchy Theory
    Hu Yuting
    Mu Lan
    Liu Zhanliang
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 16 - +
  • [8] Evaluation Research on policy risk of BOT project in Expressway Based on Structural Equation
    Bing, Xu
    Lu, Liu
    REGIONAL DEVELOPMENT AND RISK MANAGEMENT IN THE WEST OF CHINA, 2012, : 165 - 171
  • [9] The research of risk management of BOT investment project
    Chen Ling
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 964 - 967
  • [10] Study of Human Resource Management in Private Enterprises
    Kong Yan
    He Cuiqin
    HUMAN RESOURCES MANAGEMENT IN THE KNOWLEDGE ECONOMY ERA, VOLS I AND II, 2009, : 34 - 39