A study on risk management for the private enterprises investing in expressway BOT project

被引:0
|
作者
Xiong, Xiaoguo [1 ]
机构
[1] Guangxi Univ, Sch Business, Nanning 530004, Peoples R China
关键词
BOT; expressway project; risk management; private enterprise;
D O I
暂无
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In recent years, the expressway construction attained considerable increase in China. Instead of the single mode of "government investment and operation", innovations of various modes are implemented in the management and financing system of expressway constructions, covering the diversified sources of investment, the financing channels and methods, a transfer of the right of toll collection. The BOT project is one of the most popular practice mode in private financial initiative modes. However, there are some investment risks and issues in implementing expressway BOT project. Targeting at minimizing various investment risks and ensuring the benefits of investors, the article tries to analyze more effective risk management modes of expressway BOT project from the perspective of private enterprise, which will have practical significance for the development of expressway construction in China.
引用
收藏
页码:451 / 454
页数:4
相关论文
共 50 条
  • [21] Sub-Optimal Risk-Return Profiles in Private Equity: The Case of Minority Business Enterprises Investing
    Demaria, Cyril
    JOURNAL OF PRIVATE EQUITY, 2011, 14 (04): : 61 - 72
  • [22] Study on the Construction of Knowledge Management System of Henan Private Enterprises
    Chang, Ying
    2011 INTERNATIONAL CONFERENCE ON ELECTRONICS, COMMUNICATIONS AND CONTROL (ICECC), 2011, : 3358 - 3361
  • [23] Study on the management policy of private enterprises' foreign direct investment
    Cai, HW
    MANAGEMENT SCIENCES AND GLOBAL STRATEGIES IN THE 21ST CENTURY, VOLS 1 AND 2, 2004, : 745 - 751
  • [24] Investment Risk Assessments of BOT Project - A case study of Yamay Resort
    Tsai, Wei-Pao
    Pan, Nai-Hsin
    Hsieh, Bor-Ming
    JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS, 2012, 15 (2-3): : 261 - 280
  • [25] The Study on Expressway Reconstruction project of China
    Yi, Yuan Chun
    SUSTAINABLE DEVELOPMENT OF URBAN INFRASTRUCTURE, PTS 1-3, 2013, 253-255 : 1139 - 1146
  • [26] PROJECT MANAGEMENT IN MANUFACTURING ENTERPRISES
    Vrchota, Jaroslav
    Rehor, Petr
    SERBIAN JOURNAL OF MANAGEMENT, 2021, 16 (02) : 341 - 353
  • [27] A study on negotiation between public and private of BOT project from view point of indefinite IRR
    Shih, Pang-Hsing
    Lu, Chao-Hong
    PROCEEDINGS OF THE 2007 CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE AND SYSTEM DYNAMICS: SUSTAINABLE DEVELOPMENT AND COMPLEX SYSTEMS, VOLS 1-10, 2007, : 1645 - 1654
  • [28] Risk-Conscious Project Management at High-Tech Enterprises
    E. A. Ratnikova
    E. V. Surkova
    O. A. Simonov
    Russian Engineering Research, 2024, 44 (8) : 1210 - 1214
  • [29] Research on problems to international engineering project risk management of petroleum enterprises
    Wang, Jiashan
    Feng, Kaiming
    Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2007, : 671 - 674
  • [30] Risk management at Slovak enterprises: an empirical study
    Strelcova, Stanislava
    Janasova, Denisa
    Simak, Ladislav
    ECONOMIC ANNALS-XXI, 2018, 174 (11-12): : 58 - 62