A study on negotiation between public and private of BOT project from view point of indefinite IRR

被引:0
|
作者
Shih, Pang-Hsing [1 ]
Lu, Chao-Hong [1 ]
机构
[1] Tongji Univ, Program Architecture, Shanghai 200092, Peoples R China
关键词
BOT project; IRR; regression analysis; public-private negotiation;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Our study used regression model to predict reliable IRR from past BOT cases at Taiwan where set PPP into action. Then we relied on reliable IRR and standard error with significant level to infer it's range. And, the range could be supposed as an accepting value between public and private. All of the above, we finally used the predict value to solve the factors of financial project and provide an equitable context when public-private in negotiation.
引用
收藏
页码:1645 / 1654
页数:10
相关论文
共 50 条
  • [1] A Negotiation Between the Public and the Private
    Mesa, Maryangel
    ARQ, 2021, (107): : 123 - 125
  • [2] Migration of demands between the public and private spheres from the point of view of gender relations: a study with nurses
    Pereira, Audrey Vidal
    Oliveira, Simone Santos
    Rotenberg, Lucia
    INTERFACE-COMUNICACAO SAUDE EDUCACAO, 2019, 23
  • [3] Differences between Public-Sector and Private-Sector Project Management Practices in Hungary from a Competency Point of View
    Blaskovics, Balint
    Maro, Zalan Mark
    Klimko, Gabor
    Papp-Horvath, Viktoria
    Csiszarik-Kocsir, Agnes
    SUSTAINABILITY, 2023, 15 (14)
  • [4] PUBLIC PRIVATE PARTNERSHIPS FROM THE POINT OF VIEW OF LARGE CONSTRUCION COMPANIES
    Devito, Antonio Cosimo
    Arditi, David
    Gottfried, Arie
    PROCEEDINGS OF INTERNATIONAL STRUCTURAL ENGINEERING AND CONSTRUCTION: INTERACTION BETWEEN THEORY AND PRACTICE IN CIVIL ENGINEERING AND CONSTRUCTION, 2016, : 369 - 374
  • [5] A view of public and private sectors for Taiwan's BOT transportation project financing using fuzzy multi-criteria methods
    Cheng, JH
    10TH IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3: MEETING THE GRAND CHALLENGE: MACHINES THAT SERVE PEOPLE, 2001, : 356 - 359
  • [6] THE PAYOFF FROM A PUBLIC PRIVATE PROJECT
    LISK, I
    WATER-ENGINEERING & MANAGEMENT, 1986, 133 (03): : 6 - 6
  • [7] IMPLEMENTATION OF PROJECT MANAGEMENT IN THE BOT MODEL OF PUBLIC-PRIVATE PARTNERSHIP IN CROATIAN TOURISM
    Peric, Marko
    EKONOMSKI PREGLED, 2012, 63 (9-10): : 518 - 540
  • [9] A study on risk management for the private enterprises investing in expressway BOT project
    Xiong, Xiaoguo
    PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2011, : 451 - 454
  • [10] Inventories and Public Information in Private Negotiation: A Laboratory Market study
    Menkhaus, Dale J.
    Phillips, Owen R.
    Yakunina, Alla V.
    AMERICAN JOURNAL OF AGRICULTURAL ECONOMICS, 2009, 91 (02) : 503 - 517