Study on risk evaluation index system to expressway BOT project

被引:0
|
作者
Xie, Zhonghui [1 ]
Li, Shucheng [1 ]
Du, Peng [1 ]
机构
[1] Hunan Univ, Coll Management, Changsha 410082, Peoples R China
关键词
expressway; risk evaluation; BOT project;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
This paper makes an integral design and detail classification to the risk evaluation index system in combination with characteristic of expressway BOT project and in view of deficiency of existing risk evaluation index system, establishing a standard for risk index quantification and risk classification. It adopts the evaluation method of Analytic Hierarchy, Process (AHP) to make a demonstration study to the risk of Changsha- Xiangtan West Route Expressway (CXWRE) BOT Project. The result demonstrates that the conclusion could basically present the risk level of this expressway BOT project; the index system and method possess certain scientific and foreseeing characteristic, which can provide theory and method for the government management and participation of expressway BOT project.
引用
收藏
页码:1638 / 1643
页数:6
相关论文
共 50 条
  • [1] Study on the Risk Management of Expressway BOT Project
    Wang Shufang
    Yang Chengzhong
    [J]. ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 84 - 88
  • [2] Risk evaluation index system and methods of BOT project finance
    Huang, XY
    Xiong, F
    Gao, XJ
    [J]. PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS 1 AND 2, 2004, : 2483 - 2488
  • [3] The Model of Risk Allocation in BOT Expressway Project
    Yun, Chen
    Wei, Tang
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL III, 2008, : 283 - 286
  • [4] A study on risk management for the private enterprises investing in expressway BOT project
    Xiong, Xiaoguo
    [J]. PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2011, : 451 - 454
  • [5] Evaluation Research on policy risk of BOT project in Expressway Based on Structural Equation
    Bing, Xu
    Lu, Liu
    [J]. REGIONAL DEVELOPMENT AND RISK MANAGEMENT IN THE WEST OF CHINA, 2012, : 165 - 171
  • [6] Research of Risk Management on XY Expressway BOT Project
    Wang, Qiu-ju
    Xue, Da-shen
    [J]. INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND SOFTWARE ENGINEERING (AISE 2014), 2014, : 271 - 276
  • [7] Study on the Mechanism of Expressway BOT Project Rate Determination
    Mu, Yi
    [J]. 2013 3RD INTERNATIONAL CONFERENCE ON EDUCATION AND EDUCATION MANAGEMENT (EEM 2013), 2013, 26 : 718 - 722
  • [8] Risk Assessment of Expressway BOT Project Based on Grey Hierarchy Theory
    Hu Yuting
    Mu Lan
    Liu Zhanliang
    [J]. ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 16 - +
  • [9] Construction of Evaluation Index System of the Operational Benefit Risk of Expressway Enterprises
    Fang Wenbin
    Chen Yun
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL III, 2008, : 210 - 212
  • [10] Evaluation on Risk Analysis for Oversea BOT Project
    An Yuhua
    Ding Xiaoxin
    [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 221 - 225