共 50 条
- [1] Study on the Risk Management of Expressway BOT Project [J]. ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 84 - 88
- [2] Risk evaluation index system and methods of BOT project finance [J]. PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS 1 AND 2, 2004, : 2483 - 2488
- [3] The Model of Risk Allocation in BOT Expressway Project [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL III, 2008, : 283 - 286
- [4] A study on risk management for the private enterprises investing in expressway BOT project [J]. PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2011, : 451 - 454
- [5] Evaluation Research on policy risk of BOT project in Expressway Based on Structural Equation [J]. REGIONAL DEVELOPMENT AND RISK MANAGEMENT IN THE WEST OF CHINA, 2012, : 165 - 171
- [6] Research of Risk Management on XY Expressway BOT Project [J]. INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND SOFTWARE ENGINEERING (AISE 2014), 2014, : 271 - 276
- [7] Study on the Mechanism of Expressway BOT Project Rate Determination [J]. 2013 3RD INTERNATIONAL CONFERENCE ON EDUCATION AND EDUCATION MANAGEMENT (EEM 2013), 2013, 26 : 718 - 722
- [8] Risk Assessment of Expressway BOT Project Based on Grey Hierarchy Theory [J]. ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 16 - +
- [9] Construction of Evaluation Index System of the Operational Benefit Risk of Expressway Enterprises [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL III, 2008, : 210 - 212
- [10] Evaluation on Risk Analysis for Oversea BOT Project [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 221 - 225