共 50 条
- [32] Research on performance evaluation index system of the large-exhibition project risk management HYDRAULIC ENGINEERING III, 2015, : 239 - 246
- [33] A method of risk analysis about BOT project PROCEEDINGS OF THE 2001 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, VOLS I AND II, 2001, : 1715 - 1719
- [34] Study on Post Evaluation's Society Index System of Resettlement in Highway Project PROCEEDINGS OF THE 2012 INTERNATIONAL CONFERENCE ON MANAGEMENT INNOVATION AND PUBLIC POLICY (ICMIPP 2012), VOLS 1-6, 2012, : 468 - 473
- [35] Study of the Rural Infrastructure Project Evaluation Index System Based on Sustainable Development ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 3088 - +
- [36] Study on Economic Evaluation Index System of Oil-Gas Exploration Project ADVANCED RESEARCH ON INFORMATION SCIENCE, AUTOMATION AND MATERIAL SYSTEM, PTS 1-6, 2011, 219-220 : 1693 - 1696
- [37] The research of risk management of BOT investment project Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 964 - 967
- [38] Growth Option Evaluation for Transportation BOT Project PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 923 - 926
- [39] Performance Evaluation of Construction Materials Management in Expressway Project MATERIALS SCIENCE AND ENGINEERING, PTS 1-2, 2011, 179-180 : 475 - 481
- [40] Study on the Decision of BOT Project Concession Period Based on a Fuzzy Comprehensive Evaluation ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2299 - 2303