共 50 条
- [1] Evaluation on Risk Analysis for Oversea BOT Project [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 221 - 225
- [2] Evaluation on Risk Analysis for Oversea BOT Project [J]. PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 428 - 431
- [3] Optimal timing of the entry and reconstruction for the BOT project based on real option theory [J]. ICIM 2006: Proceedings of the Eighth International Conference on Industrial Management, 2006, : 572 - 577
- [4] Study on combination of abandon option and growth option in project investment [J]. PROCEEDINGS OF 2006 CHINESE CONTROL AND DECISION CONFERENCE, 2006, : 983 - 985
- [5] Congestion deterioration and transportation project evaluation [J]. The Annals of Regional Science, 2007, 41 : 145 - 170
- [6] Congestion deterioration and transportation project evaluation [J]. ANNALS OF REGIONAL SCIENCE, 2007, 41 (01): : 145 - 170
- [8] Real Option in BOT projects [J]. MANAGING AND MODELLING OF FINANCIAL RISKS - 6TH INTERNATIONAL SCIENTIFIC CONFERENCE PROCEEDINGS, PTS 1 AND 2, 2012, : 180 - 185
- [9] Survey of option game theory on project evaluation [J]. ADVANCES IN MANAGEMENT OF TECHNOLOGY, PROCEEDINGS, 2007, : 341 - 346
- [10] Evaluation and competitive tendering of BOT power plant project in China [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (04): : 333 - 341