Study on the Risk Management of Expressway BOT Project

被引:0
|
作者
Wang Shufang [1 ]
Yang Chengzhong [1 ]
机构
[1] E China Jiaotong Univ, Civil & Architecture Sch, Nanchang, Peoples R China
关键词
Risk Management; BOT Project; Expressway; Financing; Enterprise Benefit; Government;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
On the analysis of the literature material and research basis, the expressway BUT project risk characteristics are summarized. From the universality and particularity of risk, the risk characteristics of expressway BOT project are analyzed; Based on the analysis of the existing situation in implementation of expressway BUT project, it is pointed out that, imperfect laws and regulations related, lack of imperfect market, earning ratio not be guaranteed, improper managing yardstick of government and indeterminate responsibility to share risks are the main problems in the expressway BUT project in China. Establishing risk awareness, improving market system, improving laws and regulations related, sharing risk reasonably as well as training and introducing professional risk management professionals, deepening the expressway BUT system reformation, improving the market system, strengthening contract management and sharing the risk rationally are the effective countermeasures in the risk management in expressway BUT project.
引用
收藏
页码:84 / 88
页数:5
相关论文
共 50 条
  • [41] Estimation method of economic risk indicator of BOT investment project
    Chen, L
    Yan, SP
    [J]. Proceedings of 2005 International Conference on Construction & Real Estate Management, Vols 1 and 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 290 - 293
  • [42] Automated approach to negotiations of BOT contracts with the consideration of project risk
    Liou, Fen-May
    Huang, Chih-Pin
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (01) : 18 - 24
  • [43] Economic Risk Assessment of Expressway Project Based on Elementary Catastrophe Theory
    Lee, Jian
    Yuanhua, Jia
    Changao, Gu
    Chuanrong, Cao
    [J]. PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & ENGINEERING MANAGEMENT, VOLS 1 AND 2, 2008, : 75 - 78
  • [44] The risk assessment of overseas infrastructure project by PPP/BOT mode
    Ren, LA
    Tao, P
    [J]. Proceedings of 2005 International Conference on Construction & Real Estate Management, Vols 1 and 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 1089 - 1091
  • [45] Risk evaluation index system and methods of BOT project finance
    Huang, XY
    Xiong, F
    Gao, XJ
    [J]. PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS 1 AND 2, 2004, : 2483 - 2488
  • [46] Study on Criterion of Differential Settlement in Subgrade Widening Project of an Expressway
    胡江碧
    张勇
    费雪良
    [J]. Journal of Beijing Institute of Technology, 2009, 18 (02) : 176 - 180
  • [47] Risk management is project management!
    Lister, T
    [J]. EIGHTEENTH ANNUAL PACIFIC NORTHWEST SOFTWARE QUALITY CONFERENCE, PROCEEDINGS, 2000, : 7 - 27
  • [48] Project risk management in practice: the actuality of project risk management in organizations
    Willumsen, Pelle Lundquist
    Oehmen, Josef
    Selim, Hani Mike Rae
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2024, 17 (4/5) : 593 - 617
  • [49] A study on the risk management of the CASA-1000 project
    Sasaki, Daisuke
    Nakayama, Mikiyasu
    [J]. HYDROLOGICAL RESEARCH LETTERS, 2015, 9 (04) : 90 - 96
  • [50] A study on risk management in E-business project
    Mu, Yuan
    Xu, Di
    [J]. Fifth Wuhan International Conference on E-Business, Vols 1-3: INTEGRATION AND INNOVATION THROUGH MEASUREMENT AND MANAGEMENT, 2006, : 646 - 652