BOT Project Risk Estimation

被引:0
|
作者
Liu, Ning [1 ]
Liu, Yachen [1 ]
Yu, Xiaosi [1 ]
机构
[1] Shenyang Jianzhu Univ, Sch Management, Shenyang, Peoples R China
关键词
BOT project; Fuzzy approach; Risk assessment; PRQ model;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper establishes the risk quantification model of three-parameter (probability controllability and consequence). The three-parameter risk quantification (PRQ) model provides a logical, reliable, and consistent procedure for assessing the BOT project risk using fuzzy approach to improve the risk evaluating quality. The model uses the fuzzy approach in scoring the subjective judgments of the experts. The fuzzy approach is described, estimation flow is introduced, and the implement step of PRQ is given. According to the model, an example of garbage burning power plant project is analyzed and validated and gets an effective way of solving risk quantity problem. The result reveals that the PRQ model can improve the BOT project risk management accurately and promotes decision making of BOT project risk management scientifically.
引用
收藏
页码:2041 / 2044
页数:4
相关论文
共 50 条
  • [1] Estimation method of economic risk indicator of BOT investment project
    Chen, L
    Yan, SP
    [J]. Proceedings of 2005 International Conference on Construction & Real Estate Management, Vols 1 and 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 290 - 293
  • [2] Risk Analysis for a BOT Project
    Bagui, Swapan Kumar
    Ghosh, Ambarish
    [J]. JORDAN JOURNAL OF CIVIL ENGINEERING, 2011, 5 (03) : 330 - 342
  • [3] Evaluation on Risk Analysis for Oversea BOT Project
    An Yuhua
    Ding Xiaoxin
    [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 221 - 225
  • [4] Study on the Risk Management of Expressway BOT Project
    Wang Shufang
    Yang Chengzhong
    [J]. ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 84 - 88
  • [5] A method of risk analysis about BOT project
    Wang, XQ
    Geng, YS
    Fu, R
    [J]. PROCEEDINGS OF THE 2001 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, VOLS I AND II, 2001, : 1715 - 1719
  • [6] The research of risk management of BOT investment project
    Chen Ling
    [J]. Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 964 - 967
  • [7] Evaluation on Risk Analysis for Oversea BOT Project
    Zhang, Ximing
    An, Yuhua
    [J]. PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 428 - 431
  • [8] The Model of Risk Allocation in BOT Expressway Project
    Yun, Chen
    Wei, Tang
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL III, 2008, : 283 - 286
  • [9] Traffic and revenue forecast at risk for a BOT road project
    Swapan Kumar Bagui
    Ambarish Ghosh
    [J]. KSCE Journal of Civil Engineering, 2012, 16 : 905 - 912
  • [10] Traffic and revenue forecast at risk for a BOT road project
    Bagui, Swapan Kumar
    Ghosh, Ambarish
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2012, 16 (06) : 905 - 912