Traffic and revenue forecast at risk for a BOT road project

被引:8
|
作者
Bagui, Swapan Kumar [1 ]
Ghosh, Ambarish [1 ]
机构
[1] Bengal Engn & Sci Univ, Dept Civil Engn, Sibpur 711103, Howrah, India
关键词
BOT; risk; revenue at risk; traffic at risk; AADT; coefficient of variation; monte carlo simulation method;
D O I
10.1007/s12205-012-1533-5
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents the risk analysis of revenue and traffic forecast of a Build Operate Transfer (BOT) road project using cumulative distribution method. In road project, traffic is the main source to earn money/revenue. Traffic is projected using various methods. Actual traffic may not follow the projected traffic and actual traffic may be reduced/increased depending on the development of the road side and near areas. Rapid development i.e., industrial, commercial, business activity creates rapid traffic growth rate which is not expected and reverse happening where road side development is negligible. Traditional traffic forecast may not consider the risk of projected traffic. This paper presents the risk analysis of the projected traffic and alternatively revenue with a real case study and determine lower and upper limit of revenue and expected revenue has been determined using Monte Carlo Simulation Method.
引用
收藏
页码:905 / 912
页数:8
相关论文
共 50 条
  • [1] Traffic and revenue forecast at risk for a BOT road project
    Swapan Kumar Bagui
    Ambarish Ghosh
    [J]. KSCE Journal of Civil Engineering, 2012, 16 : 905 - 912
  • [2] Analysis of traffic revenue risk factors in BOT road projects in developing countries
    Babatunde, Solomon Olusola
    Perera, Srinath
    [J]. TRANSPORT POLICY, 2017, 56 : 41 - 49
  • [3] Revenue Risk Modelling and Assessment on BOT Highway Project
    Novianti, T.
    Setyawan, H. Y.
    [J]. 2ND INTERNATIONAL JOINT CONFERENCE ON SCIENCE AND TECHNOLOGY (IJCST) 2017, 2018, 953
  • [4] The Mechanism Design of Traffic BOT Project Auction
    Yan, Pei-Sheng
    Wang, Xian-Jia
    [J]. FIRST IITA INTERNATIONAL JOINT CONFERENCE ON ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2009, : 23 - 26
  • [5] BOT Project Risk Estimation
    Liu, Ning
    Liu, Yachen
    Yu, Xiaosi
    [J]. EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 2041 - 2044
  • [6] Risk Analysis for a BOT Project
    Bagui, Swapan Kumar
    Ghosh, Ambarish
    [J]. JORDAN JOURNAL OF CIVIL ENGINEERING, 2011, 5 (03) : 330 - 342
  • [7] The Road Traffic Advisor project
    Ellis, S
    Lansdown, T
    Richardson, J
    [J]. TENTH INTERNATIONAL CONFERENCE ON ROAD TRANSPORT INFORMATION AND CONTROL, 2000, (472): : 1 - 5
  • [8] Forecast of traffic jam at intersections on urban road
    Chen, Xiao-Hong
    Qian, Da-Lin
    [J]. Huanan Ligong Daxue Xuebao/Journal of South China University of Technology (Natural Science), 2010, 38 (07): : 72 - 77
  • [9] Support Loan Concept for the Viability of a BOT Road Project
    Bagui, Swapan Kumar
    Ghosh, Ambarish
    [J]. JORDAN JOURNAL OF CIVIL ENGINEERING, 2013, 7 (01) : 17 - 25
  • [10] Support loan concept for the viability of a BOT road project
    [J]. 1600, Jordan University of Science and Technology (07):