共 50 条
- [1] Evaluation on Risk Analysis for Oversea BOT Project [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 221 - 225
- [2] A method of risk analysis about BOT project [J]. PROCEEDINGS OF THE 2001 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, VOLS I AND II, 2001, : 1715 - 1719
- [3] Evaluation on Risk Analysis for Oversea BOT Project [J]. PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 428 - 431
- [4] BOT Project Risk Estimation [J]. EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 2041 - 2044
- [5] RISK ANALYSIS FOR BOT IN SEWAGE TREATMENT PROJECT BASED ON BAYESIAN NETWORK [J]. ICIM2014: PROCEEDINGS OF THE TWELFTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2014, : 271 - 274
- [6] Study on the Risk Management of Expressway BOT Project [J]. ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 84 - 88
- [7] The research of risk management of BOT investment project [J]. Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 964 - 967
- [8] The Model of Risk Allocation in BOT Expressway Project [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL III, 2008, : 283 - 286
- [9] Rapid risk analysis for highway BOT project using the data of feasibility report [J]. Beijing Gongye Daxue Xuebao / Journal of Beijing University of Technology, 2010, 36 (01): : 51 - 57
- [10] THE LIFE CYCLE INTEGRATED RISK ANALYSIS AND MANAGEMENT OF INVESTMENT IN BOT METRO PROJECT [J]. PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 2415 - 2422