THE LIFE CYCLE INTEGRATED RISK ANALYSIS AND MANAGEMENT OF INVESTMENT IN BOT METRO PROJECT

被引:0
|
作者
Mao, Yihua [1 ]
Xiang, Jianguo
Cheng, Yanhong [1 ]
机构
[1] Zhejiang Univ, Coll Architecture & Civil Engn, Hangzhou, Zhejiang, Peoples R China
关键词
Metro project; BOT; The Life Cycle; Risk Analysis and Management; Fuzzy Synthesis Evaluation;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The construction and development in large cities bring the requirement of more and more metros. For the risk of the metro projects under the BOT mode, the index system of evaluation is established on the basis of factors analysis. By questionnaire and experts scoring, the weight of each index is determined through Fuzzy Synthesis Evaluation, after identifying risks using WBS (Work Breakdown Structure). The research comes to the conclusion that when the risk of the whole project is at middle, it means to the inventors that their losing will probably exceed 50%; by adopting BOT mode in the Metro project, the greatest risks will occur at the construction period of the project and the initial stage of the operation, and the risks that the investors will face during different processes are different which means the risks are processed dependently. Then the Life Cycle Integrated Risk Management of Metro was suggested, which could help to make full use of all sources and fulfill the goal of minimizing the risk cost during the life cycle of Metro, and different management strategies in different stages are laid out.
引用
收藏
页码:2415 / 2422
页数:8
相关论文
共 50 条
  • [1] The research of risk management of BOT investment project
    Chen Ling
    [J]. Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 964 - 967
  • [2] Integrated Risk Management Based on Life Cycle of Engineering Project
    Luo, Fuzhou
    Han, Yanhu
    [J]. ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2680 - 2683
  • [3] Integrated Risk Management for Renewable Energy Investment over Life Cycle
    Sun, Qin
    Grijalva, Santiago
    [J]. 2012 IEEE ENERGY CONVERSION CONGRESS AND EXPOSITION (ECCE), 2012, : 3772 - 3779
  • [4] Risk Management and the Life Cycle of the Project
    Obrova, Vladena
    Smolikova, Lenka
    [J]. CREATING GLOBAL COMPETITIVE ECONOMIES: 2020 VISION PLANNING & IMPLEMENTATION, VOLS 1-3, 2013, : 1370 - 1377
  • [5] Risk factors in project management life cycle
    Karaulova, T.
    Kramarenko, S.
    Shevtshenko, E.
    [J]. PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE OF DAAAM BALTIC INDUSTRIAL ENGINEERING, PTS 1 AND 2, 2008, : 327 - 332
  • [6] Risk Analysis for a BOT Project
    Bagui, Swapan Kumar
    Ghosh, Ambarish
    [J]. JORDAN JOURNAL OF CIVIL ENGINEERING, 2011, 5 (03) : 330 - 342
  • [7] An Integrated Project Management Life Cycle Supporting System Safety
    Tschuertz, Hans
    Schedl, Gabriele
    [J]. MAKING SYSTEMS SAFER, 2010, : 71 - +
  • [8] Estimation method of economic risk indicator of BOT investment project
    Chen, L
    Yan, SP
    [J]. Proceedings of 2005 International Conference on Construction & Real Estate Management, Vols 1 and 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 290 - 293
  • [9] Study on the Risk Management of Expressway BOT Project
    Wang Shufang
    Yang Chengzhong
    [J]. ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 84 - 88
  • [10] LIFE CYCLE MANAGEMENT FOR AN INVESTMENT PROJECT IN CLUJ-SALAJ AREA, ROMANIA
    Ciomos, Vasile Iuliu
    Ciataras, Dorin Marcel
    Vlaicu, Ilie
    [J]. TRANSYLVANIAN REVIEW OF ADMINISTRATIVE SCIENCES, 2011, (32E) : 15 - 27