共 50 条
- [1] Risk factors in project management life cycle [J]. PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE OF DAAAM BALTIC INDUSTRIAL ENGINEERING, PTS 1 AND 2, 2008, : 327 - 332
- [2] Knowledge-based Risk Management in Project Life Cycle [J]. CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1435 - 1440
- [4] Integrated Risk Management Based on Life Cycle of Engineering Project [J]. ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2680 - 2683
- [5] Study on risk management in total life cycle of construction project [J]. TIRMDCM 2007: PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON TECHNOLOGY INNOVATION, RISK MANAGEMENT AND SUPPLY CHAIN MANAGEMENT, VOLS 1 AND 2, 2007, : 348 - 352
- [6] Research on the System of the Construction Project Life Cycle Cost Risk Management [J]. ADVANCES IN STRUCTURAL ENGINEERING, PTS 1-3, 2011, 94-96 : 2329 - 2332
- [8] THE LIFE CYCLE INTEGRATED RISK ANALYSIS AND MANAGEMENT OF INVESTMENT IN BOT METRO PROJECT [J]. PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 2415 - 2422
- [9] The Research on Risk Management of Whole Life Cycle Project Based on PDCA theory [J]. PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & ENGINEERING MANAGEMENT, VOLS 1 AND 2, 2008, : 298 - 303
- [10] Software Project Total Life Cycle Risk Management Model Based on QFD [J]. 2008 INTERNATIONAL WORKSHOP ON INFORMATION TECHNOLOGY AND SECURITY, 2008, : 251 - 255