BOT Project Risk Estimation

被引:0
|
作者
Liu, Ning [1 ]
Liu, Yachen [1 ]
Yu, Xiaosi [1 ]
机构
[1] Shenyang Jianzhu Univ, Sch Management, Shenyang, Peoples R China
关键词
BOT project; Fuzzy approach; Risk assessment; PRQ model;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper establishes the risk quantification model of three-parameter (probability controllability and consequence). The three-parameter risk quantification (PRQ) model provides a logical, reliable, and consistent procedure for assessing the BOT project risk using fuzzy approach to improve the risk evaluating quality. The model uses the fuzzy approach in scoring the subjective judgments of the experts. The fuzzy approach is described, estimation flow is introduced, and the implement step of PRQ is given. According to the model, an example of garbage burning power plant project is analyzed and validated and gets an effective way of solving risk quantity problem. The result reveals that the PRQ model can improve the BOT project risk management accurately and promotes decision making of BOT project risk management scientifically.
引用
收藏
页码:2041 / 2044
页数:4
相关论文
共 50 条
  • [41] A Flexible Franchise Fee Scheme in a BOT Project
    Chiang, Yao-Min
    [J]. INTERNATIONAL REAL ESTATE REVIEW, 2012, 15 (01): : 127 - 139
  • [42] Analyses on the Credit Enhancement of BOT Project Finance
    Zhang, Zhi-Ying
    Teng, Jing
    Fu, Qin
    Zou, Wan-Ling
    [J]. PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND MANAGEMENT INNOVATION, 2014, : 453 - 457
  • [43] Growth Option Evaluation for Transportation BOT Project
    Zijing Jiang
    [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 923 - 926
  • [44] The Ashkelon 100 MCM/year BOT project
    Kronenberg, G
    [J]. DESALINATION, 2003, 152 (1-3) : 103 - 112
  • [45] AN ASSESSMENT OF PROJECT RISK AND ESTIMATION UNCERTAINTY IN HYDROLOGIC DESIGN
    LALL, U
    [J]. HYDROLOGICAL SCIENCES JOURNAL-JOURNAL DES SCIENCES HYDROLOGIQUES, 1982, 27 (02): : 195 - 195
  • [46] Study on Credit Enhancement of BOT Project Financing
    Dai, Xujuan
    [J]. INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT (EBM2011), VOLS 1-6, 2011, : 1303 - 1306
  • [47] Decision Model for Concession Period of Infrastructure BOT Project
    Wu, Yuan
    Wu, Min
    Lei, Yang
    [J]. PROCEEDINGS OF THE 16TH INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE (CRIOCM2011), 2011, : 157 - 160
  • [48] Status and Psychology of DBB and BOT Construction Project Participants
    Leu, Wen-Hao
    Chang, Andrew S.
    [J]. FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 160 - 166
  • [49] The effects of service level on BOT transport project contract
    Zhang, Yiwen
    Feng, Zhuo
    Zhang, Shuibo
    Song, Jinbo
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2018, 118 : 184 - 206
  • [50] Study on the Mechanism of Expressway BOT Project Rate Determination
    Mu, Yi
    [J]. 2013 3RD INTERNATIONAL CONFERENCE ON EDUCATION AND EDUCATION MANAGEMENT (EEM 2013), 2013, 26 : 718 - 722