A Heuristic Approach for Rework-Based Product Design Project Scheduling Problem

被引:0
|
作者
lu, Rui [1 ]
Li, Linying [2 ]
机构
[1] Northeastern Univ, Key Lab Proc Ind Automat, Minist Educ, Shenyang 110004, Peoples R China
[2] Chinese Acad Sci, Shenyang Inst Automat, Shenyang 110016, Peoples R China
关键词
Stochastic RCPSP; Overlap; Iteration; Product Design Project; Simulation;
D O I
10.1109/CCDC.2008.4597565
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Product design project scheduling is a complex problem which involves a large number of tasks and information exchanges in a stochastic, resource-constrained project network where iteration and overlap between tasks often take place. The classical determined RCPSP which has been widely studied is based on assumption of fixed duration of tasks and zero-lag finish-start precedence relationships in acyclic AON network. Very little efforts have been made in project scheduling with stochastic duration, especially in cyclic network with rework possibility. This paper presents an approach for rework-based product design project scheduling problem, taking overlap and iteration which are inherent nature in PDP into account. We consider this problem under the assumption that task duration can be modeled by a triangle distribution and can be sampled by simulation techniques. Three priority rules which are widely used in solving deterministic RCPSP are modified by replacing deterministic duration by a dynamic one. Finally computational experiments for this heuristic approach are provided.
引用
下载
收藏
页码:1486 / 1491
页数:6
相关论文
共 50 条
  • [21] A Heuristic Approach to the Railroad Track Maintenance Scheduling Problem
    Peng, Fan
    Kang, Seungmo
    Li, Xiaopeng
    Ouyang, Yanfeng
    Somani, Kamalesh
    Acharya, Dharma
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2011, 26 (02) : 129 - 145
  • [22] A novel heuristic approach for job shop scheduling problem
    Wang, Yong-Ming
    Xiao, Nan-Feng
    Yin, Hong-Li
    Hu, En-Liang
    FRONTIERS IN ALGORITHMICS, PROCEEDINGS, 2007, 4613 : 252 - +
  • [23] Heuristic Based Scheduling for Toothpaste Filling Problem
    Promjun, S.
    Jarumaneeroj, P.
    INTERNATIONAL CONFERENCE ON RECENT ADVANCES IN INDUSTRIAL ENGINEERING AND MANUFACTURING, 2019, 530
  • [24] Robust Project Scheduling with Unreliable Resources: A Variable Neighbourhood Search Based Heuristic Approach
    Chakrabortty, Ripon K.
    Abbasi, Alireza
    Ryan, Michael J.
    2018 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2018, : 656 - 660
  • [25] Study on Underway Replenishment Scheduling Project of Naval Battle Group Based on Heuristic Approach
    Yu Peng
    He Xuejun
    Tan Zhiyou
    PROCEEDINGS 2013 INTERNATIONAL CONFERENCE ON MECHATRONIC SCIENCES, ELECTRIC ENGINEERING AND COMPUTER (MEC), 2013, : 1943 - 1946
  • [26] A BASIS FOR THE DESIGN OF A MULTIATTRIBUTE HEURISTIC FOR SINGLE RESOURCE PROJECT SCHEDULING
    KHATTAB, M
    CHOOBINEH, F
    COMPUTERS & INDUSTRIAL ENGINEERING, 1992, 22 (02) : 157 - 161
  • [27] A BASIS FOR THE DESIGN OF A MULTIATTRIBUTE HEURISTIC FOR SINGLE RESOURCE PROJECT SCHEDULING
    KHATTAB, M
    CHOOBINEH, F
    COMPUTERS & INDUSTRIAL ENGINEERING, 1991, 21 (1-4) : 291 - 295
  • [28] A heuristic approach to fuzzy resource-constrained project scheduling
    Yeh, CH
    Pan, HQ
    Willis, RJ
    COMPUTATIONAL INTELLIGENCE FOR MODELLING, CONTROL & AUTOMATION - EVOLUTIONARY COMPUTATION & FUZZY LOGIC FOR INTELLIGENT CONTROL, KNOWLEDGE ACQUISITION & INFORMATION RETRIEVAL, 1999, 55 : 423 - 428
  • [29] A genetic programming approach for heuristic selection in constrained project scheduling
    Padman, R
    Roehrig, SF
    INTERFACES IN COMPUTER SCIENCE AND OPERATIONS RESEARCH: ADVANCES IN METAHEURISTICS, OPTIMIZATION, AND STOCHASTIC MODELING TECHNOLOGIES, 1997, : 405 - 421
  • [30] Client perspective based multi-mode project payment scheduling problem and its heuristic
    School of Management, Xi'an Jiaotong University, Xi'an 710049, China
    Xitong Gongcheng Lilum yu Shijian, 2009, 2 (70-77):