Study on Underway Replenishment Scheduling Project of Naval Battle Group Based on Heuristic Approach

被引:0
|
作者
Yu Peng [1 ]
He Xuejun [1 ]
Tan Zhiyou [1 ]
机构
[1] Naval Univ Engn, NUE Logist Acad, Tianjin, Peoples R China
关键词
heuristic approach; underway replenishment; scheduling;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This study formulates a model to solve the scheduling problem of underway replenishment of naval battle group. First, an analogy is made between the underway replenishment scheduling project of naval battle group (URSP) and vehicle scheduling Problem (VSP). Then the impact factors to URSP based on the analysis of the similarity and difference between URSP and VSP are figured out and analyzed. The model of URSP is described, and its parameters are analyzed, and the quantitative approaches are given. The heuristic approach is provided to solve URSP, and an example is used to validate its feasibility, then the replenishment sequence is worked out. The result indicates that the model and the heuristic approach can be used to solve the URSP with complex constraints well, the result can be used as the support of decision-making.
引用
收藏
页码:1943 / 1946
页数:4
相关论文
共 50 条
  • [1] Research on the Underway Replenishment Simulation Model of a Navy Battle Group
    Yu Peng
    He Xuejun
    Tan Zhiyou
    PROCEEDINGS OF 2013 INTERNATIONAL SYMPOSIUM ON APPLIED ENGINEERING, TECHNICAL MANAGEMENT, AND INNOVATION, 2014, : 178 - 181
  • [2] Study on A Kind of Warship Formation Underway Replenishment Scheduling Problem
    Dong, Peng
    Wu, Chong
    Yu, Peng
    Li, Hongyang
    PROCEEDINGS OF 2018 IEEE 4TH INFORMATION TECHNOLOGY AND MECHATRONICS ENGINEERING CONFERENCE (ITOEC 2018), 2018, : 1611 - 1616
  • [3] A Heuristic Approach for Rework-Based Product Design Project Scheduling Problem
    lu, Rui
    Li, Linying
    2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 1486 - 1491
  • [4] SCHEDULING TARGET ILLUMINATORS IN NAVAL BATTLE-GROUP ANTI-AIR WARFARE
    SHERALI, HD
    LEE, YH
    BOYER, DD
    NAVAL RESEARCH LOGISTICS, 1995, 42 (05) : 737 - 755
  • [5] Robust Project Scheduling with Unreliable Resources: A Variable Neighbourhood Search Based Heuristic Approach
    Chakrabortty, Ripon K.
    Abbasi, Alireza
    Ryan, Michael J.
    2018 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2018, : 656 - 660
  • [6] A heuristic approach to fuzzy resource-constrained project scheduling
    Yeh, CH
    Pan, HQ
    Willis, RJ
    COMPUTATIONAL INTELLIGENCE FOR MODELLING, CONTROL & AUTOMATION - EVOLUTIONARY COMPUTATION & FUZZY LOGIC FOR INTELLIGENT CONTROL, KNOWLEDGE ACQUISITION & INFORMATION RETRIEVAL, 1999, 55 : 423 - 428
  • [7] A genetic programming approach for heuristic selection in constrained project scheduling
    Padman, R
    Roehrig, SF
    INTERFACES IN COMPUTER SCIENCE AND OPERATIONS RESEARCH: ADVANCES IN METAHEURISTICS, OPTIMIZATION, AND STOCHASTIC MODELING TECHNOLOGIES, 1997, : 405 - 421
  • [8] A heuristic approach for resource constrained project scheduling with uncertain activity durations
    Bruni, M. E.
    Beraldi, P.
    Guerriero, F.
    Pinto, E.
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (09) : 1305 - 1318
  • [9] A resource constrained project scheduling problem with reattempt at failure: A heuristic approach
    Mori, M
    Tseng, CC
    JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 1997, 40 (01) : 33 - 44
  • [10] A GENERALIZED HEURISTIC LEARNING APPROACH TO PROJECT SCHEDULING PROBLEMS WITH RESOURCE CONSTRAINTS
    Shue, Li-Yen
    Li, Sheng-Tun
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2008, 25 (03) : 204 - 214