A heuristic approach to fuzzy resource-constrained project scheduling

被引:0
|
作者
Yeh, CH [1 ]
Pan, HQ [1 ]
Willis, RJ [1 ]
机构
[1] Monash Univ, Sch Business Syst, Clayton, Vic 3168, Australia
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents the fuzzy priority heuristic with a parallel scheduling scheme for solving resource-constrained problems under the uncertainty of activity times. A fuzzy ordering procedure is proposed to create priority lists for the scheduling scheme, A numeric example is given to examine the effectiveness of the approach.
引用
收藏
页码:423 / 428
页数:6
相关论文
共 50 条
  • [1] Fuzzy resource-constrained project scheduling with multiple routes: A heuristic solution
    Birjandi, Alireza
    Mousavi, S. Meysam
    [J]. AUTOMATION IN CONSTRUCTION, 2019, 100 : 84 - 102
  • [2] Resource-constrained project scheduling approach under fuzzy conditions
    Knyazeva, Margarita
    Bozhenyuk, Alexander
    Rozenberg, Igor
    [J]. ICTE IN REGIONAL DEVELOPMENT 2015, 2015, 77 : 56 - 64
  • [3] A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling
    Seda, Milos
    Matousek, Radomil
    Osmera, Pavel
    Pivonka, Petr
    Sandera, Cenek
    [J]. WCECS 2009: WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS I AND II, 2009, : 730 - +
  • [4] HEURISTIC PERFORMANCE AND NETWORK RESOURCE CHARACTERISTICS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
    ULUSOY, G
    OZDAMAR, L
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1989, 40 (12) : 1145 - 1152
  • [5] A Practical Approach for Resource-Constrained Project Scheduling
    Manousakis, Konstantinos
    Savva, Giannis
    Papadouri, Nicos
    Mavrovouniotis, Michalis
    Christofides, Athanasios
    Kolokotroni, Nedi
    Ellinas, Georgios
    [J]. IEEE ACCESS, 2024, 12 : 12976 - 12991
  • [6] A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling
    Pilar Tormos
    Antonio Lova
    [J]. Annals of Operations Research, 2001, 102 : 65 - 81
  • [7] A NEW HEURISTIC SOLUTION METHOD IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
    BELL, CE
    HAN, J
    [J]. NAVAL RESEARCH LOGISTICS, 1991, 38 (03) : 315 - 331
  • [8] A neural network based heuristic for resource-constrained project scheduling
    Shou, YY
    [J]. ADVANCES IN NEURAL NETWORKS - ISNN 2005, PT 1, PROCEEDINGS, 2005, 3496 : 794 - 799
  • [9] Resource-constrained project scheduling:: A critical activity reordering heuristic
    Valls, V
    Quintanilla, S
    Ballestín, F
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (02) : 282 - 301
  • [10] Entropy-Based Heuristic for Resource-Constrained Project Scheduling
    Christodoulou, Symeon E.
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2017, 31 (03)