A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling

被引:0
|
作者
Seda, Milos [1 ]
Matousek, Radomil [1 ]
Osmera, Pavel [1 ]
Pivonka, Petr [3 ]
Sandera, Cenek [2 ]
机构
[1] Brno Univ Technol, Fac Mech Engn, Inst Automat & Comp Sci, Tech 2896-2, CZ-61669 Brno, Czech Republic
[2] FME BUT, Brno, Czech Republic
[3] Brno Univ Technol, Dept Automat & Measurement, Fakulty Elect Engn & Commun, CZ-61200 Brno, Czech Republic
关键词
project management; resource-constrained scheduling; NP-hard problem; CPM; heuristic method; GENETIC ALGORITHM; CLASSIFICATION; NOTATION; MODELS;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Resource-constrained project scheduling is an NP-hard optimisation problem. There are many different heuristic strategies how to shift activities in time when resource requirements exceed their available amounts. These strategies are frequently based on priorities of activities. In this paper, we assume that a suitable heuristic has been chosen to decide which activities should be performed immediately and which should be postponed and investigate the resource-constrained project scheduling problem (RCPSP) from the implementation point of view. We propose an efficient routine that, instead of shifting the activities, extends their duration. It makes it possible to break down their duration into active and sleeping subintervals. Then we can apply the classical Critical Path Method that needs only polynomial running time. This algorithm can simply be adapted for multiproject scheduling with limited resources.
引用
收藏
页码:730 / +
页数:3
相关论文
共 50 条
  • [1] Heuristic Algorithm in Optimizing Stochastic Resource-Constrained Project Scheduling
    Guo, Fang Ming
    Ma, Li
    He, Min
    [J]. INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION, VOL 1, PROCEEDINGS, 2009, : 975 - +
  • [2] Heuristic Optimization for Robust Resource-Constrained Flexible Project Scheduling Problem
    Liu, Yongli
    Li, Renjie
    Liu, Huiran
    [J]. IEEE ACCESS, 2020, 8 : 142269 - 142281
  • [3] A heuristic search algorithm for solving resource-constrained project scheduling problems
    Ahsan, MK
    Tsao, DB
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2003, 20 (02) : 143 - 160
  • [4] A heuristic approach to fuzzy resource-constrained project scheduling
    Yeh, CH
    Pan, HQ
    Willis, RJ
    [J]. COMPUTATIONAL INTELLIGENCE FOR MODELLING, CONTROL & AUTOMATION - EVOLUTIONARY COMPUTATION & FUZZY LOGIC FOR INTELLIGENT CONTROL, KNOWLEDGE ACQUISITION & INFORMATION RETRIEVAL, 1999, 55 : 423 - 428
  • [5] An evolutionary algorithm for resource-constrained project scheduling
    Hindi, KS
    Yang, HB
    Fleszar, K
    [J]. IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (05) : 512 - 518
  • [6] Flexible Scheduling Approach for Resource-Constrained Project Scheduling Problems
    Liu, Shixin
    Tukel, Oya I.
    Rom, W.
    [J]. 2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3522 - +
  • [7] HEURISTIC PERFORMANCE AND NETWORK RESOURCE CHARACTERISTICS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
    ULUSOY, G
    OZDAMAR, L
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1989, 40 (12) : 1145 - 1152
  • [8] Multimode resource-constrained project scheduling in flexible projects
    Kosztyan, Zsolt T.
    Szalkai, Istvan
    [J]. JOURNAL OF GLOBAL OPTIMIZATION, 2020, 76 (01) : 211 - 241
  • [9] Multimode resource-constrained project scheduling in flexible projects
    Zsolt T. Kosztyán
    István Szalkai
    [J]. Journal of Global Optimization, 2020, 76 : 211 - 241
  • [10] Scheduling resource-constrained projects with a flexible project structure
    Kellenbrink, Carolin
    Helber, Stefan
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 246 (02) : 379 - 391