An evolutionary algorithm for resource-constrained project scheduling

被引:50
|
作者
Hindi, KS [1 ]
Yang, HB [1 ]
Fleszar, K [1 ]
机构
[1] Brunel Univ, Dept Syst Engn, Uxbridge UB8 3PH, Middx, England
关键词
evolutionary computation; resource-constrained scheduling; scheduling;
D O I
10.1109/TEVC.2002.804914
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The single-mode, single-project, resource-constrained project-scheduling problem is solved by an evolutionary algorithm. The design of this algorithm is presented. Results of a computational study on two sets of benchmark problems, the first consisting of 330 problem instances and the second 2040, are presented. These results show that the proposed algorithm is effective in terms of the number of times it achieves both the best-known solutions and the average error with respect to these solutions, particularly given that the best-known solutions have been compiled from various sources, using a variety of algorithms. Moreover, the computation time requirements are quite modest.
引用
收藏
页码:512 / 518
页数:7
相关论文
共 50 条
  • [1] A hybrid evolutionary algorithm for the resource-constrained project scheduling problem
    Thammano A.
    Phu-ang A.
    [J]. Artificial Life and Robotics, 2012, 17 (2) : 312 - 316
  • [2] A Multiagent Evolutionary Algorithm for the Resource-Constrained Project Portfolio Selection and Scheduling Problem
    Shou, Yongyi
    Xiang, Wenwen
    Li, Ying
    Yao, Weijian
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [3] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    [J]. Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [4] A competitive genetic algorithm for resource-constrained project scheduling
    Hartmann, S
    [J]. NAVAL RESEARCH LOGISTICS, 1998, 45 (07) : 733 - 750
  • [5] An efficient hybrid algorithm for resource-constrained project scheduling
    Chen, Wang
    Shi, Yan-jun
    Teng, Hong-fei
    Lan, Xiao-ping
    Hu, Li-chen
    [J]. INFORMATION SCIENCES, 2010, 180 (06) : 1031 - 1039
  • [6] A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling
    Seda, Milos
    Matousek, Radomil
    Osmera, Pavel
    Pivonka, Petr
    Sandera, Cenek
    [J]. WCECS 2009: WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS I AND II, 2009, : 730 - +
  • [7] Population learning algorithm for resource-constrained project scheduling
    Jedrzejowicz, P
    Ratajczak, E
    [J]. ARTIFICIAL NEURAL NETS AND GENETIC ALGORITHMS, PROCEEDINGS, 2003, : 223 - 228
  • [8] Memetic algorithm for the resource-constrained project scheduling problem
    Chen, Di
    Liu, Shixin
    Qin, Shujin
    [J]. 2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 4991 - 4996
  • [9] Genetic algorithm for the resource-constrained project scheduling problem
    Goncharov, E. N.
    Leonov, V. V.
    [J]. AUTOMATION AND REMOTE CONTROL, 2017, 78 (06) : 1101 - 1114
  • [10] An Effective Evolutionary Algorithm for Pre-emptive Resource-constrained Project Scheduling Problems
    Zhu, Lie
    Li, Xiaoping
    [J]. IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC 2010), 2010,