共 50 条
- [2] An Orthogonal hybrid algorithm for the resource-constrained project scheduling problem [J]. 2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 8292 - 8297
- [4] An efficient simulation algorithm for Resource-Constrained Project Scheduling Problem [J]. Open Mechanical Engineering Journal, 2014, 8 (01): : 9 - 13
- [10] Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling [J]. Proceedings of the Second International Conference on Information and Management Sciences, 2002, 2 : 440 - 440