A hybrid genetic algorithm for the resource-constrained project scheduling problem

被引:158
|
作者
Valls, Vicente
Ballestin, Francisco
Quintanilla, Sacramento
机构
[1] Univ Valencia, Fac Econ & Empresariales, Dept Econ Financiera & Matemat, Valencia 46071, Spain
[2] Univ Navarra, Fac Econ & Empresariales, Dept Estadist & Invest Operat, Pamplona 31006, Spain
[3] Univ Valencia, Fac Matemat, Dept Estadist & Invest Operat, E-46100 Valencia, Spain
关键词
project management; scheduling; heuristics;
D O I
10.1016/j.ejor.2006.12.033
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper we propose a Hybrid Genetic Algorithm (HGA) for the Resource-Con strained Project Scheduling Problem (RCPSP). HGA introduces several changes in the GA paradigm: a crossover operator specific for the RCPSP; a local improvement operator that is applied to all generated schedules; a new way to select the parents to be combined; and a two-phase strategy by which the second phase re-starts the evolution from a neighbour's population of the best schedule found in the first phase. The computational results show that HGA is a fast and high quality algorithm that outperforms all state-of-the-art algorithms for the RCPSP known by the authors of this paper for the instance sets j60 and j120. And that it is competitive with other state-of-the-art heuristics for the instance set j30. (C) 2007 Elsevier B.V. All rights reserved.
引用
收藏
页码:495 / 508
页数:14
相关论文
共 50 条
  • [1] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    [J]. Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [2] Genetic algorithm for the resource-constrained project scheduling problem
    Goncharov, E. N.
    Leonov, V. V.
    [J]. AUTOMATION AND REMOTE CONTROL, 2017, 78 (06) : 1101 - 1114
  • [3] An Orthogonal hybrid algorithm for the resource-constrained project scheduling problem
    Huang, Zhiyu
    [J]. 2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 8292 - 8297
  • [4] A hybrid evolutionary algorithm for the resource-constrained project scheduling problem
    Thammano A.
    Phu-ang A.
    [J]. Artificial Life and Robotics, 2012, 17 (02) : 312 - 316
  • [5] A competitive Genetic Algorithm for resource-constrained project scheduling problem
    Wang, H
    Lin, D
    Li, MQ
    [J]. Proceedings of 2005 International Conference on Machine Learning and Cybernetics, Vols 1-9, 2005, : 2945 - 2949
  • [6] A genetic algorithm for solving resource-constrained project scheduling problem
    Wang, H
    Lin, D
    Li, MQ
    [J]. ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 : 185 - 193
  • [7] Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem
    王宏
    李同玲
    林丹
    [J]. Transactions of Tianjin University, 2010, (05) - 382
  • [8] A new genetic algorithm for resource-constrained project scheduling problem
    Luo Ronggui
    Chen Xiaoming
    Huang Minmei
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS 1 AND 2, 2006, : 1595 - 1599
  • [9] Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem
    王宏
    李同玲
    林丹
    [J]. Transactions of Tianjin University, 2010, 16 (05) : 376 - 382
  • [10] Efficient genetic algorithm for resource-constrained project scheduling problem
    Wang H.
    Li T.
    Lin D.
    [J]. Transactions of Tianjin University, 2010, 16 (5) : 376 - 382