Genetic algorithm for the resource-constrained project scheduling problem

被引:22
|
作者
Goncharov, E. N. [1 ,2 ]
Leonov, V. V. [2 ]
机构
[1] Novosibirsk State Univ, Novosibirsk, Russia
[2] Russian Acad Sci, Siberian Branch, Sobolev Inst Math, Novosibirsk, Russia
基金
俄罗斯基础研究基金会;
关键词
resource-constrained project scheduling problem; renewable resources; genetic algorithms; PCPLIB; CLASSIFICATION;
D O I
10.1134/S0005117917060108
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We consider the resource-constrained project scheduling problem with respect to the makespan minimization criterion. The problem accounts for technological constraints of activities precedence together with resource constraints. We propose a genetic algorithm with two versions of crossovers based on the idea of most rational use of constrained resources. The crossovers uses a heuristic that takes into account the degree of criticality for the resources, which is derived from the solution of a relaxed problem with a constraint on accumulative resources. A numerical experiment with examples from the PCPLIB library has shown that the proposed algorithm has competitive quality. For some examples from the j120 test series the best known solutions were improved and for j60 (50 000 and 500 000 iterations) and for j120 (500 000 iterations) we have obtain the best average deviations of the solutions from the critical path value.
引用
收藏
页码:1101 / 1114
页数:14
相关论文
共 50 条
  • [1] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    [J]. Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [2] A competitive Genetic Algorithm for resource-constrained project scheduling problem
    Wang, H
    Lin, D
    Li, MQ
    [J]. Proceedings of 2005 International Conference on Machine Learning and Cybernetics, Vols 1-9, 2005, : 2945 - 2949
  • [3] A genetic algorithm for solving resource-constrained project scheduling problem
    Wang, H
    Lin, D
    Li, MQ
    [J]. ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 : 185 - 193
  • [4] Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem
    王宏
    李同玲
    林丹
    [J]. Transactions of Tianjin University, 2010, (05) - 382
  • [5] A new genetic algorithm for resource-constrained project scheduling problem
    Luo Ronggui
    Chen Xiaoming
    Huang Minmei
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS 1 AND 2, 2006, : 1595 - 1599
  • [6] Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem
    王宏
    李同玲
    林丹
    [J]. Transactions of Tianjin University, 2010, 16 (05) : 376 - 382
  • [7] Efficient genetic algorithm for resource-constrained project scheduling problem
    Wang H.
    Li T.
    Lin D.
    [J]. Transactions of Tianjin University, 2010, 16 (5) : 376 - 382
  • [8] A hybrid genetic algorithm for the resource-constrained project scheduling problem
    Valls, Vicente
    Ballestin, Francisco
    Quintanilla, Sacramento
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (02) : 495 - 508
  • [9] Solving Resource-Constrained Project Scheduling Problem by Genetic Algorithm
    Kadam, Sachin U.
    Kadam, Narendra S.
    [J]. 2014 2ND INTERNATIONAL CONFERENCE ON BUSINESS AND INFORMATION MANAGEMENT (ICBIM), 2014,
  • [10] A Genetic Algorithm with Neighborhood Search for the Resource-Constrained Project Scheduling Problem
    Proon, Sepehr
    Jin, Mingzhou
    [J]. NAVAL RESEARCH LOGISTICS, 2011, 58 (02) : 73 - 82